Browse
Search
2017-169-E AMS - Tile Restoration, Inc. for flooring at Seymour Center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-169-E AMS - Tile Restoration, Inc. for flooring at Seymour Center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 11:21:55 AM
Creation date
5/16/2017 4:16:40 PM
Metadata
Fields
Template:
Contract
Date
5/16/2017
Contract Starting Date
5/16/2017
Contract Ending Date
6/30/2017
Contract Document Type
Contract
Amount
$9,745.00
Document Relationships
R 2017-169-E AMS - Tile Restoration, Inc. for flooring at Seymour Center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:98A0406E-2030-44A2-8DAE-6F7B91 D48481 <br /> SaniG A <br /> ',MIAS:A.:0N, .1t4‘..A:ltk,.... kT R 1,4 <br /> SOYPDXYTM Sa • <br /> m Pure Performance <br /> j ■ Yo ring <br /> ■Solution lution Resource filer <br /> A d <br /> ww w.tilerestorationine.com <br /> T . <br /> ve:h the power otXOtltB- <br /> 119 East Main Street <br /> Sustainable Flooring System Hookerton,NC 28538 ApraxtManddtA110111 mhaotwmi,im. <br /> Phone: 866-327-4600 mfaaa <br /> t 15015 <br /> • <br /> Freddy Brooks Date: 03/30/2017 08:44 PM <br /> Orange County Public Works Phone: 919-245-2636 Rep.:Brad Albritton <br /> 600 Highway 86 North Fax: 919-644-3043 Cell :252-916-2045 <br /> Hillsborough,NC 27278 Email:fbrooks @orangecountync.gov Fax: 252-376-1452 <br /> Email:brada @tilerestorationinc.com <br /> Process Description of Area Price <br /> 1 460E lc Urethane Epic Urethane Application-Hallway and Area to left of the <br /> Epic stairwell $ 1,450.00 <br /> 1 460E lc Urethane Epic Urethane Application-Cafe Floor and Hallway next to <br /> Epic kitchen $2,950.00 <br /> 1 460 Epic Urethane Epic Urethane Application-Recreation Area $4,395.00 <br /> Seymour Center <br /> Proposal Includes: <br /> Stripping of finish from VCT Flooring <br /> Application of Epic Urethane Finish <br /> Project can be separated into multiple mobilizations if needed. <br /> 50%of Proposal Due Before Work is Scheduled Deposit Due <br /> A Fee of 2.5%wi11 be added for all Credil Card Transaclions <br /> Terms:Net 20 Days TOTAL $8,795.00 <br /> Please Remit All Contracts,PO's and Payments To: <br /> Tile Restoration Inc.119 East Main St PO Box 160 Hookerton NC 28538 <br /> Proposal Valid for 30 Days Delivery to Job,Sales Tax and Installation are included. <br /> All services guaranteed as specified.All work to be complete in a workmanlike manner according to standard practices.Any alteration or deviation from this proposal involving <br /> extra costs will be executed only upon written orders,and will become an extra charge over and above the proposal.All agreements contingent upon strikes,accidents or delays <br /> beyond our control.Owner to carry fire,tornado and other necessary insurance. <br /> Our workers are fully covered by workman's Compensation Insurance.Evidence of Insurance will be provided upon request.Any special requirements or endorsements may incur <br /> additional charges. <br /> We do not waive any rights of subrogation against contractor or owner for any loss covered by insurance of any type. <br /> All Tile Restoration services require a minimum of 72 of cure time before they can be exposed to moisture.If this timeline is not adhered to the customer takes full responsibility <br /> for any damage or performance issues that may result. *Epoxies chalk and yellow with age,extended exposure to UV and artificial lighting.Lack of ventilation, incomplete <br /> mixing,miscatalyzation or the use of heaters that emit carbon dioxide and carbon monoxide during application and initial stages of curing may cause amine blush,possibly <br /> affecting adhesion of subsequent topcoats. <br /> TRI marketing will send periodic email communication informing you of various service offerings.At any time you wish to stop receiving this information you may opt out from <br /> within the email received or contact our office. <br /> ••Tile Restoration will take all precaution to protect adjoining flooring,walls,materials etcetera from exposure to water and/or chemicals.Any damage that may occur from <br /> contact from water and/or chemical is not the responsibility of Tile Restoration Inc.and its staff.Any changes or additional work required or requested by the owner,will be done <br /> at an additional charge and must be written.I hereby give Tile Restoration Inc.authorization to do the work specified and payment will be made as outlined above <br /> 13 0175 G <br /> ust PDT 1(0011492. bkrc® 7/1I2.-0ib tr `7, 7 /00 <br /> ®3 C_tAtti Ut tJ ce <br /> oQ <br /> A®Iwf)U pro 1■" NC- <br /> ?o ?7,1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.