Browse
Search
2017-165-E AMS - Reece, Noland & McElrath Engineers, Inc. to design services for emergency generator installs countywide
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-165-E AMS - Reece, Noland & McElrath Engineers, Inc. to design services for emergency generator installs countywide
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2018 11:17:59 AM
Creation date
5/16/2017 8:54:22 AM
Metadata
Fields
Template:
Contract
Date
4/13/2017
Contract Starting Date
2/2/2017
Contract Ending Date
7/31/2017
Contract Document Type
Contract
Amount
$6,800.00
Document Relationships
R 2017-165-E AMS - Reece, Noland & McElrath Engineers, Inc. to design services for emergency generator installs countywide
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:2472E8AE-3F95-4B92-B6CF-9B11 F6EF6E7E <br /> FAI I RIsM <br /> ENGINEER ► <br /> REECE, NOLAND&McELRATH, INC. <br /> 94 Main Street <br /> Canton, North Carolina 28716 <br /> 828-492-0677• Fax 828-492-1054 <br /> www.rnm-engineers.com <br /> DESIGN SERVICES PROPOSAL <br /> County of Orange <br /> Emergency Generator Installations <br /> Various County Buildings <br /> Orange County,North Carolina <br /> February 2,2017 -Revised <br /> Reece,Noland,&McElrath Engineers propose to provide Professional Engineering Services for furnishing <br /> individual Estimates of Probable Construction Costs for the installation of Emergency Generator Systems <br /> at seven(7)county buildings. <br /> PROJECT DESCRIPTION: This project involves installation of emergency generators and automatic <br /> transfer switches at multiple county owned buildings. Facilities included are the Animal Services Center, <br /> Cedar Grove,Efland,Hillsborough Commons,Passmore(Triangle Sportsplex) Seymour,Rena,and <br /> Piedmont Food&Agricultural Processing. Our fee is based on assessing the loads and developing a <br /> preliminary design concept for each facility in order to allow us to generate the estimates. Design fees will <br /> also be provided by building for the actual design work involved in the installations. <br /> FEE: Our lump sum fee for the scope of work identified above is$6800.00(Six Thousand Eight Hundred <br /> Dollars). The milestones for billing for the project are as follows: Estimates with Narrative Included 90%, <br /> Owner Review 10%. <br /> BILLINGS/PAYMENTS: Invoices will be presented monthly,based on progress during the month. <br /> Payments will be due on a net 30-day basis. Financing charges on balance beyond 30 days will be 1-1/2% <br /> per month(18%APR). If we should have to seek legal action to effect collection,and we prevail in <br /> litigation,then all costs associated with collecting overdue accounts will be recoverable. If payments are <br /> withheld or disputed,then we retain the right to suspend further services until the account is current. <br /> Submitted by: Accepted by: <br /> REECE,NOLAND&McELRATH,INC. <br /> Stephen C.Kaufman,PE <br /> February 2,2017 <br /> Date Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.