Browse
Search
Agenda - 03-02-2006-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-02-2006
>
Agenda - 03-02-2006-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:54:29 AM
Creation date
8/29/2008 9:09:22 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2006
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 20060302
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />-2- <br />This latest CGLS ruling has been a shock to all of the County/Mebane engineering personnel <br />involved in the permitting and review process, because this represents a new requirement not <br />previously stated by CGLS. Additional project delays consequent to this ruling can be <br />minimized once the BOCC makes the decision to move forward with an expedited locally <br />funded project. Plans and specifications showing the reduced scope project and the <br />County's letter of intent (to reconfigure the project) can be readied and submitted very <br />quickly. CGLS should then be able to make its decision on the adequacy of Mebane's <br />infrastructure improvement plan (approving the County's plans and specs should be a <br />essentially a pro forma process), If Mebane's plans are approved, CGLS authorization to <br />advertise the project for bidders within five days of the County's formal statement of its intent <br />to reconfigure the STAG project and the actual advertisement could published within a week <br />of CGLS authorization to advertise. Should Mebane's plan not be approved, the project <br />would be delayed until a satisfactory plan is developed and approved. <br />Reconfiguring the existing STAG funded project the Gravelly Hill portion of the existing STAG <br />funded Buckhorn Road EDD/Community project will require the following actions on the part <br />of the BOCG, County staff, the County s engineering consultant (Coulter Jewell Thames - <br />CJT), the City of Mebane and CGLS: <br />• Submit a plan (with supporting documentation) to improve the existing Mebane <br />infrastructure - by the City of Mebane -accomplished as of 3(1!2006 <br />• BOCC approves reconfiguration of STAG funded project by designating a locally funded <br />project containing just the Buckhorn EDD/Gravelly Hill utility extension <br />BOCC approves or modifies the attached draft letter declaring its intent to reconfigure the <br />STAG funded project by breaking out the Buckhorn EDD/Gravelly Hill utility extension as <br />a separate locally funded project and authorizes the Chair to sign it once written <br />confirmation is provided by CGLS that the proposed STAG project reconfiguration does <br />not threaten the level of STAG funding in any way <br />• County staff forwards the Board's letter of intent to reconfigure the STAG project to CGLS <br />• CJT submits plans and specifications reflecting project reconfiguration (deleting all plan <br />elements applicable to northern Buckhorn Community, all specification elements related <br />to STAG requirements) and all CGLS comments, requirements, etc., applicable to the <br />locally funded project. CGLS reviews letter of intent to reconfigure project and revised <br />plans and specifications (essentially a pro forma process) and Mebane's proposal and <br />documentation relative to improvement to its infrastructure. <br />• CGLS approves all submitted documents, proposals, etc., and authorizes advertising of <br />bids. <br />If I may provide additional information or clarification of the information provided herein at this <br />time, please advise. <br />
The URL can be used to link to this page
Your browser does not support the video tag.