Browse
Search
Agenda - 03-02-2006-10b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 03-02-2006
>
Agenda - 03-02-2006-10b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 1:54:29 AM
Creation date
8/29/2008 9:09:22 AM
Metadata
Fields
Template:
BOCC
Date
3/2/2006
Document Type
Agenda
Agenda Item
10b
Document Relationships
Minutes - 20060302
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />MEMORANDUM <br />TO: Orange County Board of Commissioners <br />CAPIES: John Link, County Manager <br />Rod Visser, Assistant County Manager <br />Donna Dean, Budget Director <br />Pam Jones, Purchasing/Central Services Director <br />FROM: Paul Thames, PE, County Enginee <br />DATE: March 2, 2006 <br />SUBJECT: Moving forward with the Buckhorn EDD/Gravelly Hill Middle School water and <br />sewer extension <br />The purpose of this memorandum is to: <br />update the Board on the latest developments related to Construction Loan and Grant <br />Section (CLGS) review of Mebane's proposal to increase the capacity of its <br />wastewater infrastructure (that portion which will receive wastewater flow from both the <br />Buckhorn EDD/Gravelly Hill school and the Buckhorn community north of I-85/40) <br />outline the regulatory approval process that allows Orange County to move forward <br />with bidding a Buckhorn EDD/Gravelly Hill water and sewer extension project. <br />As the Board will recall from staff memorandums and presentations at several BOCC <br />meetings and work sessions in February, a project that will provide water and sewer utilities <br />to Gravelly Hill Middle School at a point in time anywhere near the proposed August 25th <br />middle school opening will require that the County initiate a constn~ction project (EDD south <br />of I-85/40 and Gravelly Hill) that is not funded through the STAG (State and Tribal Assistance <br />Grant) process. It may be possible for a locally funded project to provide the means <br />(completed water system, short term pump and haul wastewater system) to meet a projected <br />August 25th school opening, Although a reconfigured project would no longer fall under <br />STAG review processes and extended timetable, the actual project review/approval/ <br />permitting would remain under the purview of CGLS, <br />County staff, the County's engineering consultant (Coulter Jewell Thames - CJT} and the <br />City of Mebane have been working to address CGLS concerns and comments arising from <br />the review process to date, As of March 15t, the City of Mebane has submitted a revised plan <br />to update the portion of its existing infrastructure that CGLS has found problematic, In a <br />subsequent CGLS communication (phone and email, attached) to County staff, CGLS staff <br />has indicated that it will not review Mebane's submittal or any more material or documents <br />submitted by the County or the City of Mebane until we submit a complete package of <br />information that includes all pertinent documentation. That package must include revised <br />plans and specifications (either showing the reduced-scope project broken out of the STAG <br />funding process or containing those STAG related revisions that have been required by <br />CGLS), a plan (with supporting documentation) to improve the existing Mebane infrastn~cture <br />and the County s formal letter of intent to reconfigure the existing STAG funded project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.