Browse
Search
2017-153 Co. Mgr. - GoTriangle - Interlocal Agreement for Cost Sharing for the Durham-Orange Light Rail Transit Project
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-153 Co. Mgr. - GoTriangle - Interlocal Agreement for Cost Sharing for the Durham-Orange Light Rail Transit Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2018 2:27:20 PM
Creation date
5/8/2017 10:59:43 AM
Metadata
Fields
Template:
Contract
Date
4/28/2017
Contract Starting Date
4/28/2017
Contract Ending Date
6/30/2037
Contract Document Type
Agreement - Interlocal
Agenda Item
4/27/17; 1
Document Relationships
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
(Linked To)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2017\Agenda - 04-27-2017 - Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the New Starts Project Cost (County Contributions). The Parties agree that total County <br /> Contributions shall not exceed 40 percent of the New Starts Project Cost. <br /> 6. The share of the County Contributions from the Dedicated Local Transit Revenues <br /> committed by Durham shall be$738.4 million YOE (Durham Share). <br /> 7. The share of the County Contributions from the Dedicated Local Transit Revenues <br /> committed by Orange shall be$149.5 million YOE (Orange Share). <br /> 8. Without further approval from Orange and Durham, GoTriangle shall allocate and pay for <br /> the Durham Share and the Orange Share of the New Starts Project Cost, including the <br /> planning, engineering, financing, and construction, from the Dedicated Local Transit <br /> Revenues in accordance with this Agreement and the 2017 County Plans. <br /> 9. GoTriangle may allocate and pay for the counties' respective shares of the New Starts <br /> Project Cost, including the planning, engineering, financing, and construction, from the <br /> Dedicated Local Transit Revenues on a pay-as-you-go basis and/or by issuing debt with a <br /> par value up to the amount committed in Paragraph 5 above. Consistent with North <br /> Carolina law and the 2017 County Plans, GoTriangle may use the Dedicated Local Transit <br /> Revenues for the purposes of issuing and repaying debt. GoTriangle will allocate debt <br /> attributed to each county as follows: eighty-one and one-half percent(81.5%)for Durham <br /> and eighteen and one-half percent(18.5%x)for Orange. <br /> 10. In preparation for submittal of the FFGA application,the Parties shall collaborate among <br /> themselves and with philanthropic, corporate, institutional, non-profit, and other <br /> supporters to secure the remainder of the non-CIG share needed for construction from <br /> sources including,but not limited to: private monetary and in-kind donations,other funds <br /> specifically identified to fund the Joint Development component of the D-O LRT Project, <br /> and additional federal and state funds(as may become available).The Parties understand <br /> that the Financial Plan for the D-O LRT Project must reflect that one hundred percent <br /> (100%) of non-CIG funds are committed prior to GoTriangle's application for a FFGA. <br /> 11. The costs to operate and maintain the D-0 LRT system (0&M Cost)will be paid first from <br /> light rail system fare revenues, with any remaining 0&M Cost being paid from the <br /> Dedicated Local Transit Revenues. <br /> 12. The division of responsibility for O&M Cost and State of Good Repair cost shall be <br /> allocated as follows: eighty percent (80%) for Durham and twenty percent (20%) for <br /> Orange through 2036, and eighty-one percent (81%) for Durham and nineteen percent <br /> (19%)for Orange thereafter. <br /> 13. If, during the term of this Agreement, federal CIG funds, private, in-kind, local or other <br /> funds as described in Paragraph 10,or state funds to be used for the D-O LRT Project are <br /> cancelled, terminated, withdrawn, do not materialize, or otherwise become unavailable <br /> for the D-O LRT Project, or if such federal CIG or state funds are reduced in an amount <br /> that requires additional local revenues beyond the County Contributions,the Parties shall <br /> meet within fifteen (15) business days to determine how to address the situation. Such <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.