Orange County NC Website
25 <br />south 870 0' 17" east 513.87 feet to a stake; thence continuing with said <br />Cushman south 820 17' 20" east 127.65 feet to a stake; thence south 11' 27' 53" <br />west 505.65 feet to a stake thence along the northern line of Tract 1 as shown on <br />plat hereinafter referred to south 87° 56' 0" west 673.27 feet to a stake; thence <br />north 2° 1' 15" east 574,10 feet to place and point of beginning, containing 8.192 <br />acres more or less, and being all of parcel "B" as shown on "PLAT OF THE <br />PROPERTY SHEPHERD D. STOREY and wife, FLORENCE S. STOREY ", <br />ACCORDING to plat and survey thereof by Norman A. Beaver, Registered Land <br />Surveyor dated October 22, 1977, recorded in Orange County Registry in Plat <br />Book 27, Page 126, to which reference is hereby made for a more particular <br />description of the same. <br />1. Sewer and water lines shall be extended at the time of site development in <br />accordance with Town of Hillsborough standards. <br />All water and sewer easements, if required, shall be shown on a plat and recorded <br />prior to issuance of certificate of occupancy. <br />3. Proposed drives and parking shall be installed and maintained as shown on the <br />January 23, 2006 site plan, <br />4. All NCDOT construction requirements shall be met. An encroachment agreement is <br />required for proposed utility work within the NC 86 Right -of -way. <br />5. Sidewalks shall be constructed and maintained as indicated on the approved site <br />plan. A sidewalk connection to Phase 2 that would extend to the future tennis courts <br />and softball field shall be constructed concurrently with Phase II activities. <br />Two access points on the north side of E. Storey Lane shall be permitted. Signage <br />shall be installed to direct the one -way traffic as indicated on the site plan. <br />Lighting and landscaping plans shall be approved prior to issuance of any building <br />permits. Installation in accordance with approved plans shall be complete prior to <br />issuance of certificate of occupancy. <br />8. Curb and gutter is required for all parking and drive areas, <br />9. If any condition of this Special Use Permit shall be held invalid or void, then this <br />Special Use Permit shall be void in it's entirety and of no effect. <br />10. This Special Use Permit shall automatically expire within twelve (12) months of the <br />date of approval if the use has not commenced or construction has not commenced <br />or proceeded unless a timely application for extension of the time limit is approved <br />by the Board of County Commissioners as provided by Section 8.4.11 of the Orange <br />County Zoning Ordinance. <br />11,A five foot sidewalk located three feet behind the curb and gutter on Storey Lane <br />shall be constructed from the easternmost entrance to the school out to NC 86, <br /><3 t ;crcp rz h_nsI " PlInning [)[, q I Rn J,P-o Pvbhc l lc f rit*,FcI) 0,111 ii, A Sd)SUI dac <br />