Browse
Search
Agenda - 02-27-2006-c1
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-27-2006
>
Agenda - 02-27-2006-c1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:40:23 AM
Creation date
8/29/2008 9:08:43 AM
Metadata
Fields
Template:
BOCC
Date
2/27/2006
Document Type
Agenda
Agenda Item
c1
Document Relationships
Minutes - 20060227
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance Requirements <br />2 School projects that <br />include retention /detention <br />ponds shall comply with <br />the requirements in Section <br />6.23.4, Operation and <br />Maintenance of Structural <br />Best Management <br />Practices <br />g Grading and Erosion Control <br />t Plans for grading and <br />erosion control shall <br />comply with standards <br />contained in the Orange <br />County Erosion and <br />Sediment Control <br />Ordinance and Manual and, <br />if applicable, The North <br />Carolina Erosion and <br />Sedimentation Control <br />Program rules; <br />2 Construction shall be <br />phased to minimize <br />disturbance and <br />sedimentation; <br />3 Sediment control <br />measures shall be properly <br />installed to filter sediment <br />from runoff during <br />construction and <br />maintained until grading is <br />complete and a permanent <br />vegetative cover has been <br />established and all slopes <br />stabilized; and <br />4 Permanent landscaping, <br />groundcover, mulch, etc. <br />shall be installed as soon <br />as practical after <br />construction activities for <br />each phase are completed. <br />PLANNING BOARD <br />RECOMMENDED EVIDENCE SUBMITTED <br />FINDINGS TO SUPPORT FINDINGS <br />17 <br />BOARD OF <br />COMMISSIONERS <br />FINDINGS <br />x Yes No The school will maintain the _Yes _No <br />bio- retention basin area <br />x Yes _No A permit will be issued by _Yes _No <br />NCDENR, land quality, prior <br />to the start of work. <br />x Yes _No An erosion control plan with _Yes _No <br />sequence is part of the <br />Erosion Control Permit <br />x_Yes _No Sediment control measures _Yes _No <br />will be installed as indicated <br />on the Erosion Control Plan. <br />x Yes _No Landscaping and <br />groundcover will be installed <br />in accordance with the <br />sequence in the Erosion <br />Control Permit, <br />Yes <br />;" ".1, 1`1 :1,11m "h t IN! z mF 1'0 h norww i.b J i1 [III .P,an..r mp AI _olu Il 111 I 3... S:Patln I�,N I,A.14d0IP doe 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.