Browse
Search
Agenda - 05-02-2017 - 8-k - Resolution to Endorse Orange County’s Draft Transportation Project Lists for the Burlington-Graham and DCHC MPOs and the TARPO (2020-2029)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 8-k - Resolution to Endorse Orange County’s Draft Transportation Project Lists for the Burlington-Graham and DCHC MPOs and the TARPO (2020-2029)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:53:49 PM
Creation date
4/27/2017 4:55:53 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8k
Document Relationships
Minutes 05-02-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
RES-2017-027 Resolution Endorsing OC's List of Transportation Projects, etc.
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2010-2019\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 <br /> SPOT P5.0 Project List <br /> Over the past few years, substantial effort has been dedicated to scoping projects to ensure that <br /> the maximum scores are obtained through the NCDOT prioritization process. As a reflection of <br /> these efforts, the updated project maps and lists for the DCHC MPO, TARPO, and B-G MPO in <br /> Orange County are provided in Attachment 4, Attachment 5, and Attachment 6, <br /> respectively. Attachment 7 provides a list of projects carried over from the last NCDOT SPOT <br /> prioritization process (P4.0). Planning efforts, e.g. the Orange County Comprehensive <br /> Transportation Plan and the DCHC MPO Comprehensive Transportation Plan (CTP), among <br /> others, provide the basis for all projects included on these draft project lists for submission to the <br /> P5.0 process. <br /> OUTBoard Meeting—April 19, 2017 <br /> The OUTBoard unanimously approved the project lists for consideration in the SPOT P5.0 <br /> process for the B-G MPO, TARPO, and the DCHC MPO with the addition of one project to the <br /> DCHC MPO list, the roundabout in Calvander at the intersection of Dairyland Road, Homestead <br /> Road, and Old NC 86. <br /> FINANCIAL IMPACT: There is no immediate financial impact associated with this item except <br /> that projects specifically categorized as bicycle and pedestrian projects will require a 20 percent <br /> local match from the County and will require the County to expend any costs related to right-of- <br /> way acquisition, engineering and design, and project management and administration if those <br /> projects are to be included in the STIP. The attached project lists contain a total of thirteen (13) <br /> separate bike/ped projects. All bike and pedestrian projects will require a future resolution or <br /> letter of commitment from Orange County indicating the County will provide the local match if <br /> any of the projects are selected for funding. This will be choreographed with the budget process <br /> if possible. If not, this match will be added to an agenda for BOCC action mid-year. <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to <br /> this agenda item: <br /> • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND <br /> ENVIRONMENTAL POLICIES <br /> The creation and preservation of infrastructure, policies, programs and funding <br /> necessary for residents to provide shelter, food, clothing and medical care for <br /> themselves and their dependents. <br /> RECOMMENDATION(S): The Manager recommends that the Board approve/endorse the <br /> resolution (Attachment 1) to submit transportation projects to the BGMPO, TARPO and DCHC <br /> MPO for State scoring and ultimate consideration of inclusion in the 2020-2029 STIP (P5.0). <br />
The URL can be used to link to this page
Your browser does not support the video tag.