Browse
Search
Agenda - 05-02-2017 - 8-d - Contract Extension for Household Hazardous Waste Collection - Clean Harbors Environmental Services
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 8-d - Contract Extension for Household Hazardous Waste Collection - Clean Harbors Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:55:20 PM
Creation date
4/27/2017 4:55:51 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
Document Relationships
Minutes 05-02-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> 81 <br /> County of Orange, NC RFP#5183 <br /> 10.0 PRICING <br /> HHW Pricing Proposal <br /> ITEM Unit Price Per Unit <br /> Household Hazardous Waste -Collection and $0, <br /> processing Pound <br /> Attendant Hourly Wage—Eubanks Hour 44o Charge(included indisliosit <br /> Attendant Hourly Wage—Walnut Greve Hour .$1;750 per month(see polo <br /> Additional Silo Labor(it needed for seasonal and heavy $35,00 Moshe rime only) <br /> uaa'a Panode Hour <br /> -Freon Cylinders Pound See cylinder rale sheet <br /> Other: These hems are NOT included in rico above Describe: <br /> ..iffitit batteries and reactive labpacks per 115-0 pad 4150.00 <br /> Radioactive materials Crise by Ciisc <br /> Fuel surcharge/recovery fee perecniage See riele 2 below <br /> • <br /> Notes: <br /> I. Clean Harbors will negotiate a reduced labor rato op no no charge,at the Willard Grove location if waste v0111111C3 for <br /> for rho program dramatically increase over the current levels In the REP,as provided in#4 below. <br /> 2. Clean Harbors is currently applying a Recovery Fee that is comprised of two components;a 2.0%charge for insurance, <br /> liability,and security costs;and a charge for Energy costs Mai Is revised monthly based on the nventge diesel prices front <br /> the US BCpartmen1 of Energy. <br /> With current diesel prices,the total recovery fee has been rolled into our pricing, I however,an additional 0.5%will apply <br /> for cach$0.10 increase in diesel cost above$4.25/gal. The additional energy fee,if applicable,will be applied to the entire <br /> invoice and will he broken out as a separate line item. <br /> The rate for mangy costs will increase if the average price of diesel has changed front the previous range bra period of <br /> more than two our of the previous three weeks, Energy cost charges will be tel on the first Wednesday of Ole 1000111 based <br /> on data from the US Dena a men!of Energy's websile— luip://ronteela.doe.govtoog/info/wohdpfdicselmsp>. <br /> New rates will apply to invoices cut the following Monday„ <br /> 3. Workers on this confuter will make more than the living wage of 510,33/hour <br /> Pap 18 <br /> HHW RFP a 8183 <br /> Company Confidential 33 www.cleanharbors.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.