Browse
Search
Agenda - 05-02-2017 - 8-c - Contract with New River Tire Recycling - Load, Transport, and Recycle or Dispose of Scrap Tires
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 8-c - Contract with New River Tire Recycling - Load, Transport, and Recycle or Dispose of Scrap Tires
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:44:00 PM
Creation date
4/27/2017 4:55:51 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8c
Document Relationships
Minutes 05-02-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br /> ATTACHMENT A: <br /> SUBCONTRACTORS <br /> Provider desiring to utilize subcontractors to load tires for Orange County must receive prior written <br /> County approval before subcontractors perform any services for the County. The County is willing to <br /> contact the subcontractor when it is time for loading, but must be provided with valid contact <br /> information for the subcontractor. Living wage standards apply to both the Provider and subcontractor. <br /> PROVIDER RESPONSIBILITIES <br /> The Provider shall be responsible for: <br /> • Providing adequate equipment at the County's Construction and Demolition Landfill(1514 <br /> Eubanks Road Chapel Hill) to receive and load tires Monday through Friday from 7:00 a.m. to <br /> 3:00 p.m. and Saturday 8:00 a.m. to 12:00 p.m. . Changes in hours will be communicated to the <br /> Contractor with 30 days'notice. Provider staffing should be used to load tires. The County will <br /> not assist in loading tires. The County Project Manager should be informed of any changes to <br /> load staffing at County facilities. The County shall have the right to approve and reject <br /> subcontractors that will be working on County property; <br /> • Providing open top trailers, and loading open top trailers at least three times per week or as <br /> otherwise directed by the County. If the open top trailer system results in tires on the asphalt pad <br /> being stored overnight, the Provider will modify the program to include two or three 50 foot <br /> tractor trailers and load the trailers on a regular basis.Any other program modification must be <br /> submitted in writing and approved by the County Project Manager. <br /> • Removing all loaded trailers within one(1) business day. <br /> • Scrap tires waiting to be loaded, are only allowed on the concrete pad. No scrap tires should be <br /> stored on the asphalt pad overnight. <br /> • Reporting the weight of the materials collected to the County; <br /> • Charging the County according to the Price Sheet as set forth in the Provider response to RFP; <br /> • Moving and placing collection containers as requested by the County;and <br /> • Utilizing containers and trailers that are safe, do not contain holes or graffiti and are clearly <br /> labeled. <br />
The URL can be used to link to this page
Your browser does not support the video tag.