Orange County NC Website
62 <br /> SPECIFIC DECISIONS FOR PROPOSED BUILDING PLAN: <br /> 1. Phase one will be approximately 112'X 200' or 22,400 S.F. The building will be a one- <br /> story pre-engineered metal building utilizing a simple saver insulation and interior <br /> ceiling finish system. Heating and cooling will be provided by units hung from the <br /> structure above with exposed duct work for supply locations. Condensers will have to <br /> be located outside the building at multiple locations. <br /> 2. Phase one will include two indoor basketball courts with 12'0"runoff between them. <br /> This will allow enough room for tilt and roll bleachers to be used for some events. <br /> 3. Study high bay lighting through the building for cost effectiveness. <br /> 4. The basketball courts will have a Rexcount like finish surface similar to the two senior <br /> centers. <br /> 5. The area remaining adjacent to the basketball courts will house the following: <br /> a) Main entrance two small reception areas/office area <br /> b) Public toilets (Code-required minimal)No locker rooms will be provided. <br /> c) Nursery <br /> d) Two classrooms with wall dividers to serve as the Kidsplex. <br /> e) Exercise machine area. This area needs to be separated from the rest of the <br /> building since access to this area is open to fitness members only. <br /> f) Phase one will also include an outdoor turf field adjacent to the building with <br /> cost effective field lighting. This field will be enclosed under a future phase of <br /> the project. <br /> g) An ADD ALTERNATE should be considered for the concrete footings for the <br /> future building structure. <br /> II II <br /> cra 222 cloister court l chapel hill, nc 27514 I t: 919.401.8586 <br />