Browse
Search
Agenda - 05-02-2017 - 6-d - Award of Design-Build Agreement – Sportsplex Field House Project
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 6-d - Award of Design-Build Agreement – Sportsplex Field House Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:37:59 PM
Creation date
4/27/2017 4:55:49 PM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
Document Relationships
Minutes 05-02-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
32 <br /> 20 <br /> no additional cost to the Owner. The Design-Builder shall remove any deficient Work and <br /> replace it with Work of specified quality, or take such other corrective action as the Owner's <br /> Authorized Representative may direct. No change in the Contract Price or in Contract Time shall <br /> be made as a result of authorizing a change in methods or equipment under this paragraph. <br /> 7.6 All materials and equipment shall be new, except as otherwise provided in the Contract <br /> Documents. When special makes or grades of material which are normally packaged by the <br /> supplier or manufacturer are specified or approved, such materials shall be delivered to the <br /> Project site in their original packages or containers with seals unbroken and labels intact. <br /> Materials shall be so stored as to assure the preservation of their quantity, quality, and fitness <br /> for the Work. Stored materials, even though approved before storage, may again be inspected <br /> by the Owner's Authorized Representative prior to their use in the Work and shall meet the <br /> requirements of the Contract Documents at the time they are incorporated into the Work. Stored <br /> materials shall be located so as to facilitate their prompt inspection. The Design-Builder shall <br /> coordinate the storage of all materials with the Owner's Authorized Representative. Materials to <br /> be stored at the Project or on the Owner's property shall not create an obstruction to the <br /> Owner's reasonable activities. Private property shall not be used for storage purposes without <br /> written permission of the owner or lessee of such property. The Design-Builder shall make all <br /> arrangements and bear all expenses for the storage of materials on private property. Upon <br /> request, the Design-Builder shall furnish the Owner a copy of the property owner's permission. <br /> All storage sites on private or the Owner's property shall be restored to their original condition <br /> by the Design-Builder at its entire expense, except as otherwise agreed to (in writing) by the <br /> owner or lessee of the property. <br /> 7.7 All materials and equipment shall be applied, installed, connected, erected, used, cleaned <br /> and conditioned in accordance with the instructions of the applicable manufacturer, fabricator, or <br /> processor, except as otherwise provided in the Contract Documents. <br /> 7.8 The Design-Builder will be fully responsible for all acts and omissions of its Subcontractors <br /> and of persons directly or indirectly employed by them and of persons for whose acts any of <br /> them may be liable to the same extent that the Design-Builder is responsible for the acts and <br /> omissions of the Design-Builder's own employees. Nothing in the Contract Documents shall <br /> create any contractual relationship between any Subcontractor or supplier and the Owner, or <br /> any obligation on the part of the Owner to pay or see to the payment of any money due any <br /> such Subcontractor or material furnisher except as may otherwise be required by law. The <br /> Owner's Authorized Representative may furnish to any Subcontractor or supplier, to the extent <br /> practicable, evidence of amounts paid to the Design-Builder on account of specific Work done. <br /> 7.9 The divisions and sections of the Specifications and the identifications of any Drawings shall <br /> not control the Design-Builder in dividing the Work among Subcontractors. <br /> 7.10 The Design-Builder agrees to bind specifically every Subcontractor to the terms and <br /> conditions of the Contract Documents for the benefit of the Owner and to furnish written <br /> evidence thereof to the Owner's Authorized Representative within seven (7) days after written <br /> request by the Owner. <br /> 7.11 The Design-Builder shall attend job progress conferences and all other meetings or <br /> conferences as directed by the Owner's Authorized Representative. The Design-Builder shall be <br /> Revised 2/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.