31 <br /> 19 <br /> 7.5 The Design-Builder shall furnish and pay for all materials, equipment, labor, transportation, <br /> construction equipment and machinery, tools, appliances, fuel, light, heat, and all other facilities <br /> and incidentals necessary for the execution, maintenance, initial operation, and completion of <br /> the Work, other than those specifically excluded by the Contract Documents and to be furnished <br /> by the Owner or others. When use or storage of hazardous materials or equipment or methods <br /> of more than ordinary risk are necessary in accomplishing the Work, the Design-Builder shall <br /> give the Owner's Authorized Representative reasonable advance notice. Design-Builder shall <br /> not pay in advance for any material, equipment, labor, transportation, construction equipment <br /> and machinery, tools, appliances, fuel, light, heat or other facilities and incidentals without the <br /> prior written consent of Owner. Unless otherwise provided herein Design-Builder shall store all <br /> supplies, materials, tools, and equipment on the Project site. <br /> (a) If any materials are to be furnished or installed by the Owner or others under the terms of the <br /> Contract Documents, said materials shall be made available to the Design-Builder at the <br /> location(s) specified in the Contract Documents. All costs of handling, transportation from the <br /> specified location to the Project, storage, and installing of Owner-furnished materials shall be <br /> included in the Contract Price. The Design-Builder shall be responsible for any demurrage, <br /> damage, loss, or other deficiencies which may occur during the Design-Builder's handling, <br /> storage, or use of such Owner-furnished material. The Owner shall deduct from any monies due <br /> or to become due the Design-Builder any cost incurred by the Owner in making good any such <br /> damage, loss, or efficiency. <br /> (i) Design-Builder shall be responsible for unloading any Owner-provided materials and <br /> for coordinating delivery of same. <br /> (ii) In the event Owner fails to timely supply needed materials and said failure directly <br /> results in a delay in the Work's critical path the sole remedy for Design-Builder shall be a day for <br /> day extension of time. <br /> (b)All equipment which is proposed to be used in the Work shall be of sufficient size and in <br /> such mechanical condition as to meet the requirements of the Work and produce a satisfactory <br /> quality of work. Equipment used on any portion of the Work shall be such that no injury to <br /> previously completed Work, adjacent property, or existing facilities shall result from its use. <br /> (c)When the methods and equipment to be used by the Design-Builder accomplishing the Work <br /> are not prescribed in the Contract Documents, the Design-Builder shall be free to use any <br /> methods or equipment that will accomplish the Work in conformity with the requirements of the <br /> Contract Documents and the prevailing local standard. <br /> (d)When the Contract Documents specify the use of certain methods and equipment, such <br /> methods and equipment shall be used unless others are authorized by the Owner's Authorized <br /> Representative. If the Design-Builder desires to use a method or type of equipment other than <br /> specified in the Contract Documents, the Design-Builder may request authority from the <br /> Owner's Authorized Representative to do so. The request shall be in writing and shall include a <br /> full description of the methods and equipment proposed and of the reasons for desiring to make <br /> the change. If approval is given, it shall be on the condition that the Design-Builder shall be fully <br /> responsible for producing Work in conformity with the requirements of the Contract Documents. <br /> If, after trial use of the substituted methods or equipment, the Owner's Authorized <br /> Representative determines that the Work produced does not meet the requirements of the <br /> Contract Documents, the Design-Builder shall discontinue the use of the substitute method or <br /> equipment and shall complete the remaining Work with the specified methods and equipment at <br /> Revised 2/17 <br />