Orange County NC Website
~~ ~ <br />Affordable Housing <br />III.C. Costs <br />Be as detailed as possible. Add or amend categories as needed, For all * items, please add details on how <br />the costs have been estimated. The second column should cover total project costs (including those met from <br />HOME. or CDBG), the third column shows how much of each line item is to be met from HOME or CDBG. <br />Totals must be consistent with the sources shown in section lIIA. <br />Category <br />(add/amend as needed All Costs This grant/loan <br />onl <br />Construction Period <br />Acquisition $ $ <br />Relocation* $ $ <br />Demolition/Cleazance $ $ <br />Site impravements* $ $ <br />Rehabilitation* $ $ <br />New construction* $ $ <br />Construction contingency $ $ <br />Architect/Bngineer fees $ $ <br />Construction loan fees $ $ <br />Construction interest* $ $ <br />Construction period taxes $ $ <br />LegaUAccounting $ $ <br />Other Prof. fees (Appraisal etc) $ $ <br />Agency project delivery costs (if <br />no develo er fee) $ $ <br />Other pre-construction or <br />construction period costs: $ $ <br /> $ $ <br /> $ $ <br />Permanent` <br />Permanent loan fees $ $ <br />Developer fee $ $ <br />Reserves $ $ <br />Other $ $ <br />Total Development Costs $ $ <br />