Browse
Search
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 04-27-2017 - Work Session
>
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 4:06:16 PM
Creation date
4/26/2017 3:11:02 PM
Metadata
Fields
Template:
BOCC
Date
4/27/2017
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
2017-153 Co. Mgr. - GoTriangle - Interlocal Agreement for Cost Sharing for the Durham-Orange Light Rail Transit Project
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 04-27-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76 <br /> Orange County Transit Plan April 25, 2017 <br /> Figure 5.4-2. Projected Debt Service Coverage Ratios: Federally-Funded Limited Obligation Bonds(LOBS) <br /> 12 <br /> 10 <br /> 8 <br /> 6 <br /> 4 <br /> 2 <br /> 0 <br /> I, 00 M O -1 N M V Ln L0 I, 00 0) O ci N M V Ln L0 I, 00 M O r-I N M It Ln l0 I, 00 M O r-I N M V Ln L0 I, 00 M O -1 N <br /> ci c-I ci N N N N N N N N N N M M M M M M M M M M ItT ItT ItT I* It It It ItT ItT V Ln 01 Ln 01 Ln 01 Ln 01 Ln 07 l0 l0 l0 <br /> O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O <br /> N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N <br /> Figure 5.4-1. Projected Debt Service Coverage Ratios: Locally-Funded Limited Obligation Bonds (LOBS) &TIFIA Loans <br /> 4 <br /> 3.5 <br /> 3 <br /> 2.5 <br /> 2 <br /> 1.5 <br /> 1 <br /> 0.5 <br /> 0 <br /> I' <br /> cO i 0N O 0 M�O--I O '-1 N M V Lr 00 M O ci N M V VI LO I, 00 M O ci N M V Ln LO I, 00 M O -1 N M V !1 LO I, 00 M O 1-1 N <br /> N N N N N N N M M M M M M M M M M V V V V V V V V V V ll ll l Ln Ln Ln Ln Ln l l LO LO LO <br /> O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O <br /> N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N N <br /> N <br /> Final Page 52 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.