Browse
Search
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 04-27-2017 - Work Session
>
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 4:06:16 PM
Creation date
4/26/2017 3:11:02 PM
Metadata
Fields
Template:
BOCC
Date
4/27/2017
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
2017-153 Co. Mgr. - GoTriangle - Interlocal Agreement for Cost Sharing for the Durham-Orange Light Rail Transit Project
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 04-27-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55 <br /> Orange County Transit Plan April 25, 2017 <br /> Figure 4.3-1. Bus Facility Project Tax District Revenue Spending the improvements will be measured through customer <br /> Overview(in YOE dollars) feedback and satisfaction surveys. <br /> Table 4.3-2. Program of Transit Stop Improvements in FY2018-20 <br /> Transit Stop Improvements (51%) Name Description <br /> OPT bus stop signs To support new OPT service <br /> Bus shelter lighting Improved lighting at selected bus <br /> stops served by CHT <br /> GoTriangle bus stop Improved bus stop for GoTriangle 405 <br /> Access improvements (34%) improvements in Carrboro service in Carrboro <br /> 2 bus stop improvements in New shelters at 2 bus stops in <br /> Carrboro Carrboro <br /> CHT system-wide bus stop Procure consultant to design system- <br /> Park-and-rides (16%) amenities guide manual wide bus stop amenity manual <br /> A <br /> CHT ADA bus stop upgrades DA improvements at stops <br /> throughout Chapel Hill/Carrboro <br /> $1,250,000 $2,500,000 Hillsborough Circulator short- Improve 5 bus stops along <br /> term bus stop improvements Hillsborough Circulator route <br /> GoTriangle bus stop Improvements at bus stops served by <br /> improvements GoTriangle and potentially by CHT or <br /> OPT <br /> Transit stop improvements account for 51 percent of Tax Enhanced passenger amenities at <br /> District Revenue to be spent on construction of bus facilities in Manning Drive Bus Station <br /> p high-volume UNC Hospitals stop <br /> this Plan. The specific projects included in this Plan and Hillsborough Train Station Bus Bus stop amenities for new <br /> preliminary anticipated implementation dates are provided in Stop Improvements Hillsborough Train Station <br /> Table 4.3-2 and Table 4.3-3. Bus stop sign design and Update the design of bus stop signs <br /> Ire placement and poles <br /> For Chapel Hill Transit, the Plan allocates funds to hire a <br /> consultant to design a system-wide bus stop amenities manual <br /> for the agency. The manual is intended to help design and <br /> improve bus stops for the transit customer, and the impacts of <br /> Final Page 31 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.