Browse
Search
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2017
>
Agenda - 04-27-2017 - Work Session
>
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 4:06:16 PM
Creation date
4/26/2017 3:11:02 PM
Metadata
Fields
Template:
BOCC
Date
4/27/2017
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Document Relationships
2017-153 Co. Mgr. - GoTriangle - Interlocal Agreement for Cost Sharing for the Durham-Orange Light Rail Transit Project
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
Minutes 04-27-2017
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2017
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br /> Orange County Transit Plan April 25, 2017 <br /> discussed in Section 4.1.3, additional service to rural Orange <br /> County is scheduled to be implemented in calendar year 2017. <br /> The original Plan set aside funds to pay for passenger transit <br /> amenities within the first three years of the Plan such as park- {, <br /> and-ride lots, bus shelters, passenger amenities such as real- <br /> time passenger information signs, and bus stop access <br /> improvements such as sidewalks. - <br /> Since 2012, GoTriangle, Chapel Hill Transit, and OPT have between Charlotte and Raleigh twice daily in each direction. <br /> worked collaboratively with the Town of Chapel Hill, Town of Under the Piedmont Improvement Program, underway since <br /> Carrboro, UNC, and Orange County to refine the list of small 2010, the North Carolina Department of Transportation <br /> capital projects to be funded using Tax District Revenue, such anticipates operating up to five daily trips between Raleigh and <br /> as bus stop enhancements and park-and-rides. Charlotte in each direction. <br /> Bus facilities that have been implemented are: Unlike other projects and services in the Plan which are <br /> managed by the local transit agencies, the Hillsborough Train <br /> • North Hillsborough Park-and-Ride (temporary lease) Station project is managed by the North Carolina Department <br /> • lease of spaces at Mebane Cone Health for park-and-ride of Transportation (NCDOT) Rail Division and is primarily state <br /> on Orange-Durham Express (Route ODX) funded. Since 2012, the NCDOT Rail Division has continued <br /> • Bus stop signs in Orange County planning and coordination activities to advance the project, <br /> • Pedestrian crossings at bus stops in Chapel Hill with support from the Town of Hillsborough and GoTriangle in <br /> a technical advisory capacity. <br /> Identified by the NCDOT as project number P-5701, the <br /> The original Plan set aside funds to support construction of an Hillsborough Train Station is programmed for construction in <br /> intercity passenger rail station in the Town of Hillsborough.The fiscal years 2019 and 2020 in the 2016-2025 State <br /> station will be served by two Amtrak passenger train routes: Transportation Improvement Program (STIP). <br /> the Carolinian, which travels between Charlotte and New York <br /> once daily in each direction, and the Piedmont, which travels <br /> Final Page 16 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.