Orange County NC Website
• , •■••■ • ro; <br /> •1.II I I*i' <br /> ACTION AGELMA IW ABSTRACT Item No. 94 <br /> MEEEING DATE October 3, 1983 . • <br /> Subject: Request by Khye Wang Ng and his wife Guat Cheog for a reiouing from <br /> Agricultural-Residential. (A-R) to Planned Development - Industrial <br /> (PD-OX) and Class A Special Use Permit <br /> Planning • . i Public Heartng: es ; I <br /> A t S : Initametion Contact: <br /> Application, Susan Smith <br /> Narrative, <br /> TaxlMap mom Number, 732-8181 EXT. 349 <br /> FJELDOSE: To consider approval of the requested rezoning and Special Use Pe4mit. <br /> 1 <br /> NEED: The applicants have requested a PD-1. designation for property located at .he <br /> Southwest corner of the intersection of NC 86 and SR 1332 (Coleman Loop <br /> An industrial building for the packaging and production of a sweet and so r <br /> sauce isiplanned by the applicants. The 5.03 acre. tract is proposed to h=ve <br /> access along NC 86. Traffic figures for NC 86 are 4500 trips/day (1978). The <br /> Orange County Health Department has approved the lot for on site sewage d.sposal <br /> and a well is proposed. The site is wooded and the building is proposed •o be <br /> set backlfram the road. The area is located in the Orange Rural Fire District <br /> and will be served by- the Orange Rescue Squad, <br /> IMPACT: The property is located in the HB-2 Rural-Industrial node as designated b the <br /> Land UselPlan and, therefore, would conform with the Land Use Plan if rez ned. <br /> The development intensity of the proposal meets the minimum required for pen <br /> space and parking spaces and does not etceed the maximum allowed Floor Ar a. <br /> :OMMENDATION: <br /> The Planning Board recommends approval subject to the following imposed co ditions <br /> 1. That a plat showing the lot and proposed buildings be recorded prior to the <br /> start of construction. <br /> 2. Drainage, soil erosion, and sedimentation plans shall be received by th <br /> Orange County Erosion and Sedimentation Control Officer. The installat on <br /> of control devices and on-going construction work shall be inspected by <br /> Orange County. The site shall be inconformance with the Soil Erosion aid <br /> Sedimentation Control Ordinance, <br /> 3. That DOT access standards be met and a driveway permit obtained. <br /> 4. That all signs shall comply with Article 9 of the Zoning Ordinance. <br /> Planning Staff concurs, <br />