Orange County NC Website
| <br /> 4 <br /> .�' - ~~=.~=�.�=.~_~ <br /> - | ' ---�---'--- <br /> .`` 1 - 7 . <br /> '. ----' <br /> - <br /> ^ ' <br /> �� <br /> � <br /> 1 � <br /> . <br /> � <br /> 8-?6 i <br /> x <br /> . � receipt of the revocation notice, the person responsible must immediately ' <br /> order all land-disturbing activities to cease, except those activities which <br /> , are specifically directed towards bringing the site back into a state of compliance. . <br /> :./ Once the site has been inspected and remedial work approved by the Erosion / <br /> . �� Control Division, the responsible party may re-apply '~ a grading permit. <br /> - <br /> ' <br /> �� . <br /> The fee for a re-application is set at 58 percent of for original permit 'e <br /> � _ except on projects where no original charge for the permit was made. On rhese <br /> projects where no fe h -�- ' those <br /> ' 50 percent of the rerate was charged, the re-application fee is set 't / <br /> ``� other than thon�=necessary�" r «� toc' Resumption pf land-disturbing activities - <br /> bring the site back into a state of compliance <br /> before reissuance of the grading permit will constitute a violation of the <br /> ' �� � ord1nance' The person responsible for the land-disturbing activity may appeal | � <br /> ' the revocation of a grading permit following the procedures set out in | ( <br /> �'.�. Section 21f of this ordinance. <br /> Amended Effective (December 6, 1978 and September 1, 1979) <br /> Section 18 Erosion and Sedimentation Control Plans <br /> | . <br /> ,� <br /> a, An erosion control plan shall be prepared when <br /> ' - °uc^^un^ 6 on. 6.1 n6 111.14 111.14 vodunn`ce The plan shall be filed <br /> ! with the Erosion Control Officer and^ e <br /> the Orange Soil and Water <br /> Conservation District; 30 days prior to the co <br /> ;�� the proposed activity. commencement of <br /> ' i b. The OraRge Soil and Water Conservation District, within 20 days of receipt <br /> ` <br /> of any plan, or within such additional time as may be prescribed by the <br /> ' Board of Commissioners of Orange County, shall review such plan and submit <br /> `� its comments and recommendations ,to the Erosion Control Officer. Failure <br /> ��� nf the District to submit its comments and recommendations to the E <br /> ��,-: Control Officer within the prescribed time will not delay final»e ro��»n � <br /> ,` on the plan, /a� �na| action <br /> \' / � ! <br /> �� �' The Erosion Control Officer will review each plan submitted and within <br /> 30 days of receipt thereof will notify the person submitting the plan <br /> that it has been approved, approved xith'mmdifioations, approved with <br /> ` ' performance reservations, or disapproved . <br /> '- '' d^ The plan required by this section shall contain such architectural and <br /> engineering drawings, maps, i calculatiAs, and narrative <br /> . ' statements as are needed to adequately describe the proposed development <br /> the tract and the measures planned to comply with the requirements of <br /> this <br /> co snrdinanc�' The plan shall comply with all applicable State and local <br /> . regulations for erosion and sediment control . Plan content may vary to <br /> � meet the needs of specific site requirements. Detailed guidelines for <br /> plan preparation may be obtained fromthe Soil Conservation 5ervi ' <br /> '` "Guide for Ernsion Cun�rol un �onstrurtfon Sites" or from the Ecess <br /> , Control Officer on request. <br /> ` r» `o» <br /> e^ Application for amendment of an erosion control plan in written and/or <br /> graphic form may be made at any time under the same conditions as approved d ` ! <br /> ""�' <br /> by the Erosion Control Officer, the land-disturbing activities as l ' <br /> not proceed except in accordance with the erosion control plan <br /> '1 originally approved. <br /> i <br /> ii1i �ended Efferti^' |Jecember 6, 1978> <br /> ���U . T <br />