Browse
Search
Agenda - 12-05-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 12-05-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:25:19 AM
Creation date
4/24/2017 1:47:54 PM
Metadata
Fields
Template:
BOCC
Date
12/5/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19831205
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> November 29,1983 -h- County Manager <br /> Driveway area (Average - 7 sites) 1.71i8 sq. ft. <br /> Home Site (Average - 9 sites) 9,220 sq. ft. <br /> Filtrr field (Average 3 sites) 7,5148 sq. ft. <br /> Total average cleared area (9 sites) 13,095 sq. ft. <br /> Three (3) of the nine (9) sites had areas cleared of less than 10,000 sq. ft. <br /> However, one site had no driveway or septic tank filter field cleared, while <br /> the remaining two had, not yet cleared for the filter field. Given this fact, <br /> all thes4es were anticipated to exceed the 10,000 sq. ft. limit after filter <br /> fields were installed, <br /> Specific information concerning all building permits is provided as an <br /> attachmentl Since 100% of the sites investigated were fould or expected <br /> to exceed the 10;000 sq. ft. limit, it was assumed that all sites in the <br /> annual estimate would do the same, <br /> 3. All single-family and individual mobile home sites would require site <br /> ins.ectiona (minimum'ofithree' ier'site). Since plan approvals would be <br /> granted tolall-single-family and mobile home sites, it follows that <br /> individual Site inspections would be required for each, ' <br /> By applying the assumtions above and estimates of time required for each <br /> activity to the estimate of permits issued annually, it was possible to <br /> derive projections of the time necessary to Garry out each activity individually <br /> and that necessary to administer the program for the year. These projections <br /> are shown on the accompanying table. The total amount of time required, though, <br /> would be 452 man-hours. This is equivalent to 56.5 man-days or 2.57 months. <br /> • <br /> .1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.