Browse
Search
Agenda - 12-05-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 12-05-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:25:19 AM
Creation date
4/24/2017 1:47:54 PM
Metadata
Fields
Template:
BOCC
Date
12/5/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19831205
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
....„ - <br /> _ <br /> - - <br /> 2i <br /> , 1 <br /> .. <br /> November 29, 1983 -3- County Manager <br /> 2. Plan Bevies, & A..rovel One and one-half (11/2) hours per site. Due to <br /> more and higher standards for erosion control and stormwater management, <br /> plan reviell, will be more extensive. Calculations of runoff supplied by <br /> the owner Or his surveyor must be verified. Plans must also be reviewed <br /> to determine tat control measures proposed will limit stormwater discharges ' <br /> to pre-development levels and that erosion will be contained within areas <br /> designated for land disturbance. <br /> The estimate of time for plan review and approval is based on the Erosion <br /> Control Officer's prior experience and includes that time necessary to <br /> prepare and issue grading permits, establish files, etc. <br /> .._ 1 <br /> 3. Site Inspections - Ohs-half (1/2) hour per site. Site inspections will take <br /> less time than the initial inspection, since the ErosionControl Officer <br /> j has familiarity with the property and approved plans. Three (3) visits <br /> are made te each site to see if control measures are installed and containing <br /> erosion. <br /> 4. Travel - T ill enty (20) minutes .er site ins.ection tri.. Travel to the <br /> UniversitylLake Watershed would be scheduled in such a manner to inspect <br /> as Many sites in that area as possible in one trip: Traveling the 50-mile <br /> round-tripldistance would take approximately one (1) hour. Travel time <br /> between sites would be approximately 10 minutes due to their scattered <br /> location. From four (4) to eight (8) inspections per day could be made, <br /> depending ,pon whether they were "initial" or "follow-up" site visits. <br /> The travel time between sites would thus vary 30 to 70 minutes per day. <br /> In total, all travel would average 20 minutes per site inspection per day. <br /> Given the amourft of time necessary for each activity, certain assumptions had <br /> to be made to estimate the annual time requirements for administering the higher <br /> erosion control standards in University Lake watershed. The assumptions used <br /> are as follows: <br /> i <br /> 1. AS mentioned previously, initial site inspections would be required of all <br /> sites ekcepi for Mobile;hoMes'being-located in'parks. Alabile home parks <br /> are either existing or receive approval of erosion control plans through <br /> another procedure. Individual units are moved to a prepared site and little <br /> or no land disturbing activity is involved. All other sites involve either <br /> clearance or land disturbance or both and would require at least an initial <br /> site inspection. <br /> 2. All singlefamily and individual Mobile home sitea would require plan review <br /> and'approval. Single-family and commercial alterations., and accessory uses <br /> were not inluded, since land disturbing activities would be minimal and cat- <br /> egorized as !exemptions. A question existed as to whether all single-family <br /> and mobile homes should be included, since some sites might fall within the <br /> exemption grianted under Section 6.1.b.(1) - land disturbing activities which <br /> would not result in the uncovering of more than 10,000 sq. ft. <br /> , <br /> On November L.8, 1983, the Erosion Control Officer traveled all roads within the <br /> University Lake watershed area and identified nine (9) sites on which building <br /> permits bad been issued and homes were under construction or sites cleared for <br /> that purpos . The average a:mound of land area disturbed on these home its <br /> is as follows: <br /> i <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.