Browse
Search
Agenda - 12-05-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 12-05-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 11:25:19 AM
Creation date
4/24/2017 1:47:54 PM
Metadata
Fields
Template:
BOCC
Date
12/5/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19831205
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' ' ~ ` — ��� -�`.�� <br /> , ^' ��� -� � ^/�����`�'' <br /> ORANGE COUNTY - <br /> ~ 1 i» <br /> BOARD OF COMMISSIONERS ACTION AGENDA <br /> ACTION AGENDA ITEM ABSTRACT ITEM NO. G~/� <br /> ' /i <br /> MEETING DATE _December 5. 1983 <br /> SUBJECT: Repair and Construction - Cedar Grove and Northside Multipurpose Center <br /> ^__ <br /> PUBLIC HEARING: YES x NO <br /> ATTACHMENT(S): INFORMATION CONTACT: ---- ` <br /> � ManaVer's Office <br /> p,t 5no <br /> PHONE NUMBERS: HILLSBOROUGH - 782-001 <br /> HILLSBOROUGH - 732-9367 <br /> CHAPEL HILL - 967-9251 <br /> MEBANE - 227-2031 <br /> , DURHAM -..688-7331 <br /> PURPOSE: To consider an emergency repair need at Cedar Grove and parking lot cnn <br /> ytructiod at Northside. - <br /> NEGU: / <br /> ��r Grove Center <br /> A recent ampling of well water revealed an above-standard bacteria count <br /> due to a defective equipment seal. Measures were immediately taken to <br /> manually treat the water. In order for the situation to be corrected on <br /> would cover doing the following: at ^ - which— <br /> 1. Felocate pump, control and piping. <br /> 2. Install new type clorinator, seal, switch, control wiring,dnd piping. <br /> valve, <br /> 3. Build a new pump enclosure. <br /> The work s ould be done during the Christmas holidays as it will take <br /> shutting off the water when the building is not being used. <br /> yorthside Multipurpose Center <br /> ' ' Full functliloning of the Center together with overflow parking from the <br /> Day Treatment <br /> has created the need to enlarge the parking lot. An application has been <br /> submitted to the Chapel Hill Planning Board to amend p='�." `v <br /> utilizing gravel andcreosotedpmle borders and cement walkway extension <br /> the cost wduld be approximately $3,000. Paving would be done at a later <br /> date with the gravel serving as a getting <br /> IMPACT: The 1983-81 Capital Fund is $469,400 of which $47,980 was undesignated as <br /> of November 1, 1983. Matching the new Outdoor Recreation grant will require re$|4 .e amount. To approve the above repair and construction needs reduce the undesj a� cap1tal <br /> � �4,��. <br /> RECOMMENDATIONCS); <br /> Approve the additional projects Grove repair at $6,000 and Northside <br /> parking lot construction at $3,000) to be paYd for out of the undesignated <br /> portion of the capital fund. <br /> � + . <br /> \ <br /> / <br />
The URL can be used to link to this page
Your browser does not support the video tag.