Orange County NC Website
. , <br /> LID <br /> Page 3 <br /> other applicablelregulations are as follows: <br /> DIMENSIONAL REQUIREMENTS R-1 R-8 <br /> Lot area/dwelling unit 40,000 sq. ft. 5,000 sq. ft. <br /> Lot width <br /> 130 ft. 50 ft. <br /> Front yard 40 ft. 20 ft. <br /> Side/rear yards 20 ft. B ft. <br /> • Building height 25 ft, 25 ft. <br /> SITE DEVELOPMENT 1- COMPARATIVE ANALYSIS <br /> To give some indication of the impact of development of the 44.8 acre tract, the <br /> density standards, of the R-1 and R-8 zoning districts were applied to determine <br /> the maximum number of housing units which could be placed on the site. Standards <br /> for estimating traffic generation, water consumption, sewage flow and school student <br /> population were then applied to ascertain the effect of the project on thoroughfares <br /> public utility systems and schools. These calculations are shown on the accompanyin <br /> table and discussed in the "Application Criteria" section. <br /> APPLICATION CRITERIA <br /> • The R-8 zoning district is one of three (3) districts designated as "high intensity <br /> residential districts". The purpose of such districts is to provide locations for <br /> high intensity relsidential development and supporting recreational, community, servi e <br /> or educational uses in areas where the full range of urban services are available. <br /> 1 <br /> Section 4.2.4 of the Zoning Ordinance states that the district designation will be <br /> applied where the following conditions exist: <br /> 1 <br /> 1. Designated by the adopted Land Use Plan as a Transition Area which <br /> can reasonably be annexed by a municipality in the ensuing 10-20 years. <br /> Staff Comment: As indicated previously, the Land Use Plan indicates the <br /> designation of the subject property as being 10-Year Trans on. Given the <br /> pattern of existing development within the area, it is reasonable to assume <br /> that annexation of the property by the Town of Chapel Hill would occur within <br /> 10-20 years. <br /> • 2. Water and sewer lines should exist at site or be assured of installation as <br /> part of the development process. <br /> Staff Comment: Water and sewer lints would be _extended at the develop'er's <br /> expense tO serve the property. Immediate water service can be provided by <br /> OWASA by-way-of the extension of a 12" or 16" main from a 16 inch main in <br /> Weaver Dairy Road. A longer line is needed to serve properties to the north <br /> of the proposed I-40. Sewer service can be provided by OWASA by extending <br /> an eight (8) inch line from existing developments adjacent thereto. <br /> 3. Vehicular:access must consist of direct access to a street clasSified,,either <br /> arterial Or collector as designated by the adopted Land Use Plan. <br /> Staff Comment: Access to the site is limited tome point only by-way-of <br /> Weaver Dairy Road. Weaver Dairy Road has been classified as an arterial <br /> street in the Orange County Land Use Plan. Direct access to this facility <br /> is available from the property in question. <br /> „ " <br />