Browse
Search
Agenda - 11-07-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 11-07-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 12:17:09 PM
Creation date
4/24/2017 12:05:57 PM
Metadata
Fields
Template:
BOCC
Date
11/7/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19831107
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
029 <br /> • <br /> To improve and expand existing facilities or add additional <br /> facilities as needed to serve the growing population of the al <br /> Recommended Direct the Ad Hoc School Capita/ Task Force to consider addil <br /> REVISION Actions: facilities or expansion of existing facilities to serve the i <br /> population. <br /> _ <br /> Place the Joppa Oaks subdivision system of roads on the schoo <br /> ' bus routing plan. <br /> Environmental Concerns GOAL: Minimize local flooding an <br /> soil erosion problems. <br /> Objectives: To reduce existing and prevent future soil erosion problems in <br /> the area. <br /> To elimEnate local flooding problems and minimize the aggravat <br /> of stormwater runoff problems by requiring that new developmen <br /> address stormwater management and infiltration requirements In <br /> the site design approval process. <br /> Recommended <br /> Actions: Request that DOT address drainage p2ablms in the improvemi <br /> and maintenance of state maintained roads. <br /> Continued support for the Sedimentation and Erosion Control Pr( <br /> Development and enforcement of stormwater management requireme( <br /> for new development activity. <br /> Encourage on-site infiltration of runoff associated with new <br /> development. <br />
The URL can be used to link to this page
Your browser does not support the video tag.