Orange County NC Website
- standards c�� �"�*=�*��n� °*�°"�" <br /> ^~.--_'- ---- ' ���� <br /> ' �— , <br /> Upon receipt of the revocation notice, the person responsible must immediately <br /> ; order all land-disturbing activities to cease, except those activities which <br /> 4 are specificilly directed towards bringing the site back into a state of compliance, 1 <br /> I Once the site has been inspected and remedial work approved by the Erosion <br /> a Control Division, the responsible party may re-apply for a grading permit. : , <br /> 4 The fee for a re-aPplication is set at 50 percent of the original permit fee - <br /> 4 except on projects where no original charge for the permit was made. On those <br /> projects where no original fee was charged, the re-application fee is set at I <br /> 1 50 percent of the crent rate. Resumption of land-disturbing activities <br /> 1 other than those ne essary to bring the site back into a state of compliance <br /> before reissuance or the grading permit will constitute a violation of the <br /> ordinance. The per on responsible for the land-disturbing activity may appeal <br /> the revocation of a grading permit following the procedures set out in <br /> Section 21f of this ordinance. <br /> Amended Effective (December 6, 1978 and September 1, 1979) <br /> . Section 18 Erosion and Sedimentation Control Plans <br /> a. An erosion con4o1 plan shall be prepared when nequiaa by <br /> hecti..on4 6 on. 6J1 o6 thiA cliudiruuice. The plan shall be filed <br /> with the Erosio6 Control Officer and the Orange Soil and Water <br /> Conservation Digtrict; 30 days prior to the commencement of <br /> the proposed activity. , <br /> il b. The Orange Soil and Water Conservation District, within 20 days of receipt <br /> of any plan, ori within such additional time as may be prescribed by the . <br /> Board of Commissioners of Orange County, shall review such plan and submit <br /> 1 its comments and recommendations to the Erosion Control Officer. Failure , <br /> of the District to submit its comments and recommendations to the Erosion , <br /> I Control Officer within the prescribed time will not delay final action <br /> 1 on the plan. <br /> 1 c, The Erosion Control Officer will review each plan submitted and within <br /> 30 days of <br /> that � receipt approved with <br /> performance �s ! <br /> d. The plan required by this section shall contain such architectural and <br /> engineering drawings, maps, assumptions, calculations, and narrative |/ <br /> statements as are needed to adequately describe the proposed development <br /> of the tract and the measures planned to comply with the requirements of <br /> this vrd1nvnce. The plan shall comply with all applicable State and local <br /> regulations for erosion and sediment control. Plan content may vary to <br /> meet the needs of specific site requirements. Detailed guidelines for <br /> plan preparationlmay be obtained fromthe Soil Conservation Service's <br /> "Guide for Erosi$n Control on Construction 5ites", or from the Erosion <br /> Control Officer on request. <br /> e. Application for amendment of an erosion control plan in written and/"' <br /> graphic form may be made at any time under the same conditions as the <br /> original application. Until such time as said amendment is approved i | <br /> by the Erosion l Officer, the land-disturbing activities shall <br /> not proceed except in accordance with the erosion control plan as . <br /> originally ap . i <br /> Amended Effective (Dec mber 6, 1978) <br /> 1 <br /> i . <br /> - | ' | <br /> •F:-.3,4-t-` 4147:47.,.- 1.,...;z-Vrt!‘,.:,,2,7.^,„..tV,t.'.' ,..-• Prv.t.‘.;:-`-'4' .-re ' -,' .6,p,:r .,, t-1%,.-,,,Zr.,,,, : ".i......,41Sint,•,.,..,,,,' .y4,.:... , -'\ <br /> .."-"=:";"-. 11.4.;c'''''WW:2.:,1-,4ft:,,n',A.4%-:Zro-VW.,:,,,..,- .,;,'::---tir ,i,*7-4,4%.3t.7. F.;-?.-- ,4_,I,V,----,,:it-tt.ggi.-1:,5 <br /> '' '..-..,;"11;. -4-,,•-•,,-=:,-,:feZrZ%-v::-.72?`,..'4%.;:-..;:3:,......"-v4:1-,214,v;--;-,-,, ,..4„-y.,.._§,-__L„. ...4.„1 ... ,4„5- --..-7,-.5,--w,..... .i.e,,,le- - , <br />