<br /> Upon receipt of the revocation notice, the person responsible must immediately
<br /> ; order all land-disturbing activities to cease, except those activities which
<br /> 4 are specificilly directed towards bringing the site back into a state of compliance, 1
<br /> I Once the site has been inspected and remedial work approved by the Erosion
<br /> a Control Division, the responsible party may re-apply for a grading permit. : ,
<br /> 4 The fee for a re-aPplication is set at 50 percent of the original permit fee -
<br /> 4 except on projects where no original charge for the permit was made. On those
<br /> projects where no original fee was charged, the re-application fee is set at I
<br /> 1 50 percent of the crent rate. Resumption of land-disturbing activities
<br /> 1 other than those ne essary to bring the site back into a state of compliance
<br /> before reissuance or the grading permit will constitute a violation of the
<br /> ordinance. The per on responsible for the land-disturbing activity may appeal
<br /> the revocation of a grading permit following the procedures set out in
<br /> Section 21f of this ordinance.
<br /> Amended Effective (December 6, 1978 and September 1, 1979)
<br /> . Section 18 Erosion and Sedimentation Control Plans
<br /> a. An erosion con4o1 plan shall be prepared when nequiaa by
<br /> hecti..on4 6 on. 6J1 o6 thiA cliudiruuice. The plan shall be filed
<br /> with the Erosio6 Control Officer and the Orange Soil and Water
<br /> Conservation Digtrict; 30 days prior to the commencement of
<br /> the proposed activity. ,
<br /> il b. The Orange Soil and Water Conservation District, within 20 days of receipt
<br /> of any plan, ori within such additional time as may be prescribed by the .
<br /> Board of Commissioners of Orange County, shall review such plan and submit
<br /> 1 its comments and recommendations to the Erosion Control Officer. Failure ,
<br /> of the District to submit its comments and recommendations to the Erosion ,
<br /> I Control Officer within the prescribed time will not delay final action
<br /> 1 on the plan.
<br /> 1 c, The Erosion Control Officer will review each plan submitted and within
<br /> 30 days of
<br /> that � receipt approved with
<br /> performance �s !
<br /> d. The plan required by this section shall contain such architectural and
<br /> engineering drawings, maps, assumptions, calculations, and narrative |/
<br /> statements as are needed to adequately describe the proposed development
<br /> of the tract and the measures planned to comply with the requirements of
<br /> this vrd1nvnce. The plan shall comply with all applicable State and local
<br /> regulations for erosion and sediment control. Plan content may vary to
<br /> meet the needs of specific site requirements. Detailed guidelines for
<br /> plan preparationlmay be obtained fromthe Soil Conservation Service's
<br /> "Guide for Erosi$n Control on Construction 5ites", or from the Erosion
<br /> Control Officer on request.
<br /> e. Application for amendment of an erosion control plan in written and/"'
<br /> graphic form may be made at any time under the same conditions as the
<br /> original application. Until such time as said amendment is approved i |
<br /> by the Erosion l Officer, the land-disturbing activities shall
<br /> not proceed except in accordance with the erosion control plan as .
<br /> originally ap . i
<br /> Amended Effective (Dec mber 6, 1978)
<br /> 1
<br /> i .
<br /> - | ' |
<br /> •F:-.3,4-t-` 4147:47.,.- 1.,...;z-Vrt!‘,.:,,2,7.^,„..tV,t.'.' ,..-• Prv.t.‘.;:-`-'4' .-re ' -,' .6,p,:r .,, t-1%,.-,,,Zr.,,,, : ".i......,41Sint,•,.,..,,,,' .y4,.:... , -'\
<br /> .."-"=:";"-. 11.4.;c'''''WW:2.:,1-,4ft:,,n',A.4%-:Zro-VW.,:,,,..,- .,;,'::---tir ,i,*7-4,4%.3t.7. F.;-?.-- ,4_,I,V,----,,:it-tt.ggi.-1:,5
<br /> '' '..-..,;"11;. -4-,,•-•,,-=:,-,:feZrZ%-v::-.72?`,..'4%.;:-..;:3:,......"-v4:1-,214,v;--;-,-,, ,..4„-y.,.._§,-__L„. ...4.„1 ... ,4„5- --..-7,-.5,--w,..... .i.e,,,le- - ,
<br />
|