Orange County NC Website
-,:.:- r-i:c •,i''-1--'.:r:.4,--::'._ . Mz r-?;y.:i:tt'ti;.i-. <br /> , . ,r4 �:^ <br /> • ~ � ---'- <br /> : ,;' . :^ .';� .r'''. -; ; _ . <br /> >"'•' .y. .-...�.•.._.. <br /> '-' � streams. Carrboro also has standards for intermittent�strea <br /> 6" ., , ➢khereas the Cotmty does not. <br /> - ---�.- --.._.., _ ._ mm ;.._ . 021 - <br /> A-13 l ;i <br /> y m, Retention a, iRuno6 6nom Industniat Sites - On sites developed j <br /> } Retention <br /> in. .tn-ial purposes 4...e„, we .znuatving the manu6actun'tg, _€_ <br /> pnaceea.ing, creating, nepaiiatg, renovating, painting, etean.ing, <br /> on asaembVng o6 goods, menchand.iae, on equipment), retention an <br /> ' detention anew, meeting the standards set 6onth .in subsection j. <br /> ' shctU be abed to ifdune that nwto66 .ia retained on the site be6ane <br /> being nelea.aed. The punpase 06 this requirement .c4 to insure that, <br /> not on,ey meet the standard set 6oath in subsection 9a. be met, <br /> but aLsa a mechanism mitt be pnav-.des to sa6eguand the to tenshed — <br /> aga.inet the, spULa:ge 06 toxic on dungevwud dubs.tances. , <br /> s <br /> Section 9 Permanent Downstream Protection of Stream Banks and Channels <br /> I <br /> i Provision shall be made for permanent protection of off-site stream banks <br /> and channels from the erosive effects of increased velocity and volume of <br /> stormwater runoffiresulting from land-disturbing activities. <br /> ti <br /> a.. Cant/tot a6 V.L6change - pnoviaons shale be made bon the cannot 06 i. <br /> dtannwaten discharges ban the .types 06 development as speci.6.Ged i <br /> below. A6texi development 06 the .site, the peak d,idchange 06 <br /> starumuaten nuno66 nesutt.ing 6nom a. ten-yeah, atanm shale be no <br /> gneatee. than :that which wouCd nesu.lt 6nom a ten-yeah atom; on the. 1 <br /> Esame site. pn.ion to development. This nequ.i.ement shaft apply to: 1 <br /> 1 i <br /> i 1. Commenc o2, .industntat, o66%ce, and inati.tutional developments <br /> 2. Matti.-6am•ty. Atsidentiat devetopme.nts o6 mane .then JO units <br /> { 3. S.thg..e-6a:ni.Cy detached nes.identiat developnents where mane •than. • <br /> 3 eats are to be created. <br /> I <br /> i b. Control of Velocity - stream banks and channels downstream from any <br /> an -disturbing activity shall be protected from increased degradation <br /> I by accelerated erosion caused by increased velocity of runoff from a <br /> land-disturbing activity. The land-disturbing activity shall be <br /> { planned and conducted such that the velocity of stormwater runoff in <br /> (( the receiving lwatercourse at the point of discharge resulting from <br /> Ia 10-year storm i after development shall not exceed the greater of: <br /> (i) the velocity as determined from the table in (F) of this rule, or <br /> (ii) the velocity in the receiving watercourse determined for the <br /> 10-year storm prior to development. <br /> ! If conditions (1) and (ii) of this paragraph cannot be met, the channel <br /> below the discharge point shall be designed and constructed to withstand <br /> the expected velocity. <br /> 1) Acceptable Management Measures - measures applied alone or in <br /> combination to satisfy the intent of this subchapter are acceptable ' <br /> if there are no, objectionable secondary consequences. Innovative <br /> techniques and ideas will be considered and may be used when shown <br /> to have the potential to produce successful results. Some alternatives <br /> are to: <br /> (i) avoid increaI ses in surface runoff volume and velocity by <br /> including measures to promote infiltration to compensate for <br /> increased runoff from areas rendered impervious; <br /> (ii) avoid increases in stormwater discharge velocities by using , ' <br /> vegetated or roughened swales and waterways in lieu of closed i <br /> drains and high velocity paved sections; j <br /> (iii) provide energy dissipaters at outlets of storm drainage <br /> facilities to reduce flow velocities at the point of discharge; <br /> these may range from simple rip rapped sections to complex }a <br /> structures;1 <br /> iv) protect watercourses subject to accelerated erosion by improving <br /> cross sections and/or providing erosion-resistant lining. <br /> C.'1 a i .>'S?a.M,'c`a` .1,'"0,:-.'' 'y" '.n� ro " 31.4 ' '-- .7 f•:x� r .... .:"u,„. 4- <br /> +.3a +;.. '^!u+-'�:n'sy:.�•:»t i'�` 'i- rR"��.,'��':i s. �. W` p�" Yw��4,f`.Yt.rn .;�,'�S"�. ?. <br /> wrt �.a, ..,y��� n �' y�s`> ar3 dl- 1S M V �'�Fr�i3"'+•�i a _��,. ,�}.�j+� <br /> '-`• S,n t . ��,s.. aa:• veLi : l'* .d•n.. .1 . pE ,,,4 saw;.. ?.. 2+y. ,4- ., •w S• <br /> .' 't.. ---1,:-.,..:;;;-;+,.r"fi e '. ... '^�'=J '.a; r"k -.',a,*•.",.,".,t c'dpkro.R,,� a t .,4'....:, , om „._ <br /> .-1.--t-....- `. -„ ,,,, x';.,-. r. Y„._ 1 .ta ,�, '"•a....-Z 1.-c tFC,` . _ 1r' ,r- Hrt, "r2 <br /> ri "'' t..'' ? Ate+„ rs•.Y»-.M..;-- �'7,y” w'�y y' y ,, 1a;;'r ,,r'Q1', sk—,r. d -'°W. '�.,.�4� <br /> t ;; a -r. 1 ....:•� e,:0-`,14,1„„'„;;--t-,_ ,�y 4.r--..M ,.,rx..ti..` �-xto.,. '` 7 " r✓' "�-x,..,`�«i y� .q 7tt - ; 74 <br /> �., -fie '. <br /> ?F.,' ...n.`,.'. "'".. ,t. __ ---7%.,;7:-..-`,-,f.- -,-:--,---';'.7.-".:;-•;,;,-. .. ,. �-.=,t,. ,..M':`,+t:! .rx'..•�.c":.d 4.,.,!-:i�..M✓r t i l L:?" ',..,..7-;:'`„,,,, , » ,. <br /> 1 <br />