Orange County NC Website
3 <br /> 1 <br /> • <br /> Commissioner WilIhoit noted the need for different levels of control fo] <br /> various suburban areas and that members of communities can provide distinction! <br /> 1 <br /> appropriate to particular areas to be considered by the Board. The Animal- <br /> . <br /> Control Ordinance will be on the agenda again for public comment on September <br /> 20, 1983. <br /> Commissioner Whitted noted the Board is trying to provide alternatives tc <br /> prevent animals fromibeing shot if they are not on owners ' property. <br /> Ms. Boggs noted: , (1) the amendments should only pertain to Orange County; <br /> (2) hunting dogs should be exempt; (3) guidelines to determine where or when a <br /> dog is considered viCious. <br /> Commissioner Whitted noted that Mr. Robinson and Attorney Gledhill will <br /> review the comments and the draft ordinance in an effort to list the optionE <br /> available. <br /> D-4 Cgritinuesi Discussion o - . - amPLZIL0D1 Capital Funds <br /> 1 <br /> Commissioner Whited noted that it was determined necessary to await the <br /> completion of the engineering study to continue the Board's considerations of <br /> the land use plan and the zoning of Cheeks Township before making a decision. <br /> 1 <br /> There is also a proposed agreement with the Town of Hillsborough to extend a <br /> 1 <br /> sewer line from the present system in Hillsborough to the Efland Cheeks School. <br /> 1 <br /> Be noted that the proposed sewer line will aid the pressure line that will' <br /> connect the present system to the Efland Cheeks School, as well as connect the <br /> school and the Efland Estates Subdivision with the sewer line. - <br /> I <br /> The primary concerns raised at the last meeting were: (1) the service <br /> expense for others to have the sewer lines; (2) the need for engineering <br /> studies; (3) the determination of appropriate location; and, (4) financial <br /> arrangements. <br /> Chairman Whitted 'noted that the engineering study and the area study of <br /> Cheeks Township would, be complete within 90-120 days; that the Farmers Home <br /> 1 <br />