Browse
Search
Agenda - 08-22-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-22-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 8:58:28 AM
Creation date
4/24/2017 10:33:26 AM
Metadata
Fields
Template:
BOCC
Date
8/22/1983
Meeting Type
Public Hearing
Document Type
Agenda
Document Relationships
Minutes - 19830822
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rg. 44 <br /> !To improve and expand existing facilities or add addition <br /> ;facilities as needed to serve the growing hl <br /> 9 g population of the area. <br /> Recommended <br /> Actions: ! Direct the School Board to consider additional facilities or <br /> expansion of existing facilities to serve the incoming population. <br /> Place the Joppa Oaks subdivision system of roads on the school <br /> bus routing plan. <br /> Environmental <br /> Concerns GOAL: Minimize local flooding and <br /> soil erosion problems. <br /> Objectives: To reduce existing and prevent future soil erosion problems in <br /> the area. <br /> To eliminate local flooding problems and minimize the aggravation <br /> of stormwater runoff problems by requiring that new development <br /> ! address stormwater management and infiltration requirements in <br /> the site design approval process. <br /> Recommended <br /> Actions: jRequest that DOT address drainage improvements in the improvement <br /> and maintenance of state maintained roads . <br /> Continued support for the Sedimentation and Erosion Control Program <br /> Development and enforcement of stormwater management requirements <br /> for new development activity. <br /> Encourage on-site infiltration of runoff associated with th new <br />
The URL can be used to link to this page
Your browser does not support the video tag.