Browse
Search
Agenda - 08-15-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-15-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 10:28:02 AM
Creation date
4/24/2017 10:27:28 AM
Metadata
Fields
Template:
BOCC
Date
8/15/1983
Meeting Type
Special Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830815
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> MINUTES <br /> ORANGE COUNTY BOARD OF COMMISSIONES <br /> August 15, 1983 <br /> The Orange County Board of Commissioners met in special joint session with <br /> the Town of Hillsborough on Monday, August 15, 1983, at 7:00 P.M. at Town <br /> Hall, Hillsborough, North Carolina to discuss the proposed sewer agreement. <br /> Commissioners Present: Richard E. Whitted, Chair, Commissioners Ben Lloyd, <br /> Shirley E. Marshall, Norman Walker and Don nillboit. <br /> Town Board Members Present: Remus Smith, Alan Lloyd, and Lynwood Brown. <br /> Town Board Members Absent: Dr. Rachel Stevens and W. Paul Martin. <br /> John McAdams, engineer for Orange County and several Hillsborough residents <br /> were also present. <br /> The topic of discussion was the sewer agreement. <br /> Mayor Lucius Cheshire stated that he had sent members of the Town Board a <br /> letter expressing concerns for extension of the line.; that since the line <br /> will be tapped into the Town's system, it should be owned by the Town. Mayor <br /> Cheshire who turned the meeting over to Commission Chairman Whitted left the <br /> meeting. <br /> Chairman Whitted reviewed with the two Boards the proposed contract, <br /> amending sections 4,5,7,9 and 12, The Boards discussed three proposals for <br /> extension of the sewer line: proposal as presented in the contract; a new <br /> proposal presented by Commissioner Smith, that the Town extend a sewer line <br /> from Lakeshore Drive to Highway 70 at the Town's own expense with the Town <br /> owning that portion of the line -- that Orange County construct a line from <br /> Highway 70 westerly with the County owning that portion of the line. The <br /> third proposed that the Town provide o27,000 in labor for the extension of the <br /> sewer line from Lakeshore Drive and the use of equipment for the line the <br /> remainder of the way to the school. The Town would then own the line from <br /> Highway 70 easterly, and the County would own the line from Highway 70 <br /> westerly. It was pointed out that FHA would not let the project for <br /> Efland-Cheeks Subdivision be separated from the school project. The following <br /> points were among those discussed at the meeting. <br /> 1. The Town of Hillsborough to lay an eight foot sewer line from <br /> Lakeshore Drive to the Efland-Cheeks School only; Orange County to <br /> provide all material for the complete project; the Town of Hillsborough <br /> to provide all equipment for the complete project; the Town to <br /> contribute up to a27,000 in labor cost and the County reimburse the Town <br /> for labor beyond the $27,000. <br /> 2. The Town of Hillsborough to own the sewer line exclusively from the <br /> intersection of Highway 70 to W. Hill Avenue, easterly; Orange County <br /> to own the sewer line exclusively from the intersection of Highway 70 <br /> and W. Hill Avenue, westerly. <br /> 3. Orange County to collect all sewer tap-on fees for their portion of <br /> the line and the Town of Hillsborough to collect all sewer tap-on fees <br /> for their gnrtioo. <br /> A. No parallel lines to be permitted to be constructed that would <br /> parallel or circumvent the Orange County line. <br /> 5. A twelve month time limit to be established for County approval of <br /> taps after which taps shell be made with only the Town's approval. <br /> 6, The sewer line to be completed within ninety days of receipt of <br /> engineering plans and material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.