Orange County NC Website
1 <br /> l - <br /> 3. The final site plan and narrative of the project <br /> incorporating all changes, deletions and additions through the final <br /> approval of the project are incorporated herein and made part of the <br /> Special Use Permit. A copy of the final site plan and narrative are • <br /> to be maintained on file with the Orange County Planning Department <br /> Only those commercial uses' specified in the project narrative and on <br /> the site plan, including but not necessarily limited to the sale of fuel <br /> for aircraft, maintenance service and flight training classes, will be <br /> permitted at the airport facility. All improvements as indicated shall <br /> "be constructed according to the constructtaa schedule set up in the <br /> final site plan and narrative. <br /> 4. The following fire protection measures shall be provided <br /> by the applicant (1) construction of a fire access road to the <br /> property from Teer Road; (2) a 24 hour/day vehicle tar security, fire <br /> fighting and maintenance purposes. The vehicle'will be outfitted with <br /> master keys, radio system, turn-out gear, portable fire extinguisher, <br /> Lire fighting ting foam airpack. Satisfaction of these requirements <br /> Company Cod by the Chief of the Orange Grove Volunteer Fire <br /> Com be ea�c)ff and the County Manager; (3) three ponds <br /> 'npeble of supplying 30,000 gallons of water <br /> over a two hour period. The water level of each pond shall be <br /> maintained at a level sufficient to supply 30,000 gallons of water over <br /> a two hour period by the mestruction of wells and the necessary <br /> hardware which would be activated when the water level drops below <br /> the required level. Drafting stations shall be Ioeated and constructed <br /> to the specifications of the Fire Company with all-weather access <br /> provided. The ponds shall be constructed in the following locations <br /> and according to the following timetable: pond number one shall be <br /> located 600 feet north of the phase one F.8.0. Hanger and shall be <br /> '. completed when phase one construction begins. Pond number two shall <br /> be located 600 feet north of the phase two maintenance hanger and <br /> shall be completed when phase two construction begins. Pond number <br /> three shall be located 400 feet northeast of the phase three <br /> maintenance hanger and shall be completed when phase three <br /> eonstruction-begireg Access to Midway Airport ;shell be provided <br /> periodically to the Fire Company and its successors in fire rotection <br /> responsibility for training exercises; (4) two hundred gallons of 5% <br /> AFFF foam shall be provided to the Fire Company, a portion <br /> (determined by the Fire Company) to•be kept on the trucks of the <br /> Fire Company and the remaining stored in the airport maintenance <br /> hangers and made available to the Fire Company at all times. An <br /> additional 20 gallons of 6% AFFP foam shall be provided to Fire <br /> Company annually for training purposes. Two foam nozzles and <br /> educators,, one for a 1-I/2° line and one for a 2-1/2" line shall be <br /> provided to Fire Company; (5) two portable 50 pound dry chemical fire <br /> extinguishers shall be provided and maintained in each of the three <br /> phases of the Airport. One shall be located in the fueling area, the <br />