Browse
Search
Agenda - 08-01-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-01-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:21:25 PM
Creation date
4/24/2017 10:05:27 AM
Metadata
Fields
Template:
BOCC
Date
8/1/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830801
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0.18 <br /> Jolii McAdams, iionsulting developt <br /> made a presentation on the ove Tr0-21.. 0 - lot <br /> and reviewed sewer and water services to the area from the <br /> Town of Rilldbarough's system. <br /> Commissioner Wilihoit asked ifapump station was required <br /> McAdams -responded that two pump stations TAEre involved,one <br /> on site,and one north of the site with a force main requiv <br /> to connect onto the existing Hillsborough system. He con- <br /> timed that the expected construction completion date is <br /> mid-July. <br /> Cammixierallhoit noted the County helped to purchase <br /> the existing line on US 70A partly as justifir!Arion for <br /> attracting future industry. <br /> Commissioner Willhoit asked if the buffer was missing along <br /> N.C. 86. McAdams responded he was observing aldwood Phase <br /> I. WUThoit asked if abetter buffer was planned for Phase <br /> II. McAdams responded he contemplated a similar buffer. <br /> Commissioner. Willhoit inquired, about access to N.C. 86. <br /> McAdams responded access would be through Taldwood Phases <br /> I and II and no lots would access directly onto N.C. 86. <br /> CammissionerWillhoit inquired about recreational facilitie <br /> Marvin Collins, Planning Director, responded, such facilitia <br /> were required in an R.-5 zoning. <br /> Planning Board member Sharlene Pilkey asked ham), many tax- <br /> payers would indirectly fund project, but not benefit from <br /> the water and sewer lines. McAdams responded the Town woulc <br /> recognize sewer revenues far in excess to address "fairness' <br /> issue. He noted the Town of Hillsborough was supplying the <br /> labor and the developer the materials as part of the ne- <br /> gotiated agreement. He continued that the Town wanted a <br /> line sized far in excess of that needed to serve the develop <br /> unit and wanted to avoid a payback agreement to the develop <br /> by sharing the costs up front. He noted there was a 12" <br /> water line which would enable the Taown to create a loop syst <br /> with Joppa Oaks. <br /> Planning Board member Irvin expressed concern with the <br /> high density proposed and asked what preparaticoswere being <br /> mag, for star:water management. McAdams responded these <br /> measures had not yet been designed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.