Orange County NC Website
. Ai. <br /> I <br /> 3. <br /> 4- <br /> Alice Gordon asked Mr. Northen if the developers would be willing to use <br /> 5. Horace Willi* Airport as a guide for their uses? <br /> 6. John Northen responded, saying they do not have that information. Out of the <br /> 7. uses that are listed, those listed first are clearly accessory. <br /> 8. Alice Gordon asked if they would be small buildings? <br /> 9. John Northen: responded, they would be enclosed on the hangars. <br /> 10. Alice Gordon: What is the total square footage of the structures? <br /> 11. Commission' er Willhoit asked where would they he located? <br /> 12, John North len: On the map, FB0 and maintenance hangars. <br /> 13. Comnrissior)ler Willhoit asked if the structures were in the third phase? <br /> i <br /> 14. He added that normally there is an indication of what structure for what use.. <br /> 15. John Northen: It will be developed as needed by phase for operation of <br /> 16, airport close to Highway 54 first. <br /> 17. Alice Gordon: Would you be able to tell which uses, which phase, and what <br /> 18. footage for usJ? <br /> 19. John Northen: Could do it and submit it - but not off the top of my head. <br /> 20. Alice Gordon asked Marvin Collins, Planning Director, if there was any <br /> 21. information froin Horace Williams? <br /> 22. Marvin Collins: Rick Cannity contacted Horace Williams regarding the proposed <br /> 23. uses.and that most of the uses proposed correspond with those at Horace Williams. <br /> 214.. Alice Gordoln. indicated she had reviewd accessory uses located at the Horace <br /> 25. Williams facility and noted there was a combined pilot ready room/lounge, Carolina <br /> 26. Flying Service, maintenance area, vending machine concession area, toilets and <br /> 27. training area. There were no large maintenance areas, radio area, concession or <br /> 28. courtesy office. <br /> 29. John Kizer asked how far are the road entrances from the runway (primary surfac <br /> 30. John Northen responded, approximately 550 feet. <br /> 31. John Kizer asked if there will be one office for each tenant? <br />