Browse
Search
Agenda - 08-01-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-01-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:21:25 PM
Creation date
4/24/2017 10:05:27 AM
Metadata
Fields
Template:
BOCC
Date
8/1/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830801
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
) <br /> • <br /> 134 <br /> If a4 of the following additional services are ordered in writing by the <br /> County there shall be a supplemental agreement in writing between the Cour <br /> 1 <br /> and the Consulting Engineer concerning the rates of pay and the estimated <br /> time and cost executed prior to the commencement of such work. Such addi- <br /> tiondl work, if required, may include the following: <br /> 11. Prepare complete construction plans and specifications and provid <br /> - I <br /> sufficient documents required for competitive bidding of any proj <br /> g. Work closely with the appropriate regulatory agencies and assist <br /> I securing approval of plans and specifications in an expeditious <br /> . manner. <br /> 18. Provide assistance in advertising for bids, receiving bids , and <br /> recommending award of contracts. <br /> 4. Schedule and conduct pre-construction conferences. <br /> 5. Performance of laboratory tests and any specialized soils testing, <br /> hydraulic evaluations or other studies which are deemed necessary. <br /> Although the cost of such tests and/or studies shall be borne by t <br /> County, prior written approval shall be secured before such specia <br /> tests or studies are performed. <br /> 51. Performance of any miscellaneous design work not specifically <br /> I covered in planned project improvements. <br /> 71i. Preparation of any special documents or maps including but not <br /> limited to those necessary for filing purposes or those which may <br /> required as related to water rights. <br /> 8. Preparing to serve or servihg as an expert witness in connection w <br /> 1 any public hearing, arbiration proceeding, legal prbceeding, or wa <br />
The URL can be used to link to this page
Your browser does not support the video tag.