Orange County NC Website
..,.., <br /> . . .. <br /> _ . ... , <br /> [ <br /> I . <br /> . . 7: , .iii.9...r,,,::...7, ... .'V.:A?j'7,;,,:.'1,7"--7,..,!: ;, .,.7••• '. )■;. ' - 1,:i$;:,, <br /> . . <br /> .... . <br /> .4.gi - ... • '- <br /> 113j <br /> • —_..—..._ .. .... ,.,—_. <br /> k9.] <br /> lin% <br /> I Evaluation of the construction feasibility of each reservoir sit <br /> I <br /> from the standpoint of topographic, geologic and soils constrain <br /> ,-, <br /> (5) Preparation of preliminary construction layouts for each feasible <br /> . , <br /> reservoir site, including identification of land area needed for <br /> I <br /> water storage, amount of land clearance and number of relocation! <br /> necessary for development and reservoir design criteria, <br /> 1 <br /> "(6) Evaluation of ability of each reservoir alone or in combination i <br /> I <br /> satisfy anticipated water demand, evaluation of relationship betty <br /> reservoir development and water and/or sewer line improvements pr <br /> posed in Section A, and discussion of integration of reservoirs i <br /> 1 county-wide water supply picture. <br /> (1,7) Preparation of preliminary cost estimates for construction of <br /> i reservoirs, including land acquisitions, construction, and operat <br /> , <br /> 1 and maintenance costs. <br /> I <br /> (3) Determine which reservoir should be developed and, if a combinatil <br /> i <br /> . ! <br /> . i of reservoir projects permits the best cost/benefit, the report mi <br /> I provide a "priority of construction" list for reservoirs in order <br /> I <br /> meet anticipated long-term water requirements. <br /> 1 <br /> (9) Recommendations for methods of financing reservoir development. <br /> i <br /> (10) Recommendations for protecting water quality in reservoirs upon <br /> I construction. . <br /> , 1 <br /> II. . The Consultant agrees that the scope of work, the methodology and the resul <br /> I <br /> ing reports will conform to its proposal to the County dated May 23, 1983, <br /> pursuaint to the Request for Proposal from the County dated April 22, 1983, <br /> i <br /> copy of which proposal and Request for Proposal is attached hereto and <br />