Browse
Search
Agenda - 08-01-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-01-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:21:25 PM
Creation date
4/24/2017 10:05:27 AM
Metadata
Fields
Template:
BOCC
Date
8/1/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830801
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, . <br /> 132 <br /> _ . <br /> (5) Development of design criteria for future expansion of Hillsboro' <br /> . water distribution system as well as that of the Orange-Alamance <br /> 1 Water Authority. <br /> (6) Development of preliminary cost estimates for improvements to the <br /> existing water distribution systems and new services provided in <br /> report, as well as long-term maintenance and operating expenses. <br /> (7) Development of a suggested "priority of construction" list for <br /> recommended improvements to the existing water distribution syste <br /> I and future expansion of the system. <br /> ( 3) Recommendations for methods of financing construction of the pro- <br /> posed improvements, including tap-on charges, special assessments <br /> and special service tax districts and what would be the projected <br /> per month water rates (cost per 1 ,000 gallons) for the customer. <br /> B. Upper Eno Reservoir Development Feasibility Study <br /> ()) A study of the present and projected population of the Northern <br /> 1 <br /> 1 Orange County area to determine initial and future water require- <br /> ! ments for residential, commercial and industrial consumption, and <br /> for fire protection purposes. <br /> 1 <br /> (2) A study of the Upper Eno Watershed, including the gathering, from <br /> 1 existing sources, of a description of the land use features, his- <br /> toric structures and sites , geology, soils, climatology, socio- <br /> economic characteristics , water and biologic resources , and point <br /> and non-pent sources of pollution. <br /> (3) Identification of potential reservoir sites in the Upper Eno Water <br /> shed, including the proposed Seven Mile Creek Reservoir and the pr <br />
The URL can be used to link to this page
Your browser does not support the video tag.