Orange County NC Website
4 , <br /> 131 <br /> _ <br /> 1 <br /> 1(5) Development of design criteria for future expansion of the Town <br /> Hillsborough's sewage collection system. <br /> (6) Development of preliminary cost estimates for improvements to th <br /> existing sewage collection system and new sewers recommended in <br /> report, as well as long term maintenance and operating expenses. <br /> (7) Development of a suggested "priority of construction" list for <br /> recommended improvements to the existing collection system and <br /> future expansions of the system. <br /> 0) Recommendations for methods of financing the construction of the <br /> proposed improvements, including tap-on charges, special assessme <br /> and special service tax districts and what would be the projected <br /> ' per month sewer rates (cost per 1 ,000 gallons) for the customer. <br /> WATER <br /> (1) A study of the present and projected population and land uses of <br /> ! study area to determine initial and future water requirements for <br /> 1 <br /> residential , commercial and industrial use, and for fire protectic <br /> purposes. <br /> (d) Preparation of preliminary layouts of major transmission lines to <br /> serve the study area. <br /> (3) Analysis of the effect that new transmission lines and water deman <br /> requirements will have on the existing Town of Hillsborough and <br /> Orange-Alamance Water Authority water systems, including the water <br /> 1 treatment plants of each. <br /> (4) Preparation of preliminary layouts of improvements that will be <br /> required in the existing Water distribution systems of Hillsborouni <br />