Browse
Search
Agenda - 08-01-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-01-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:21:25 PM
Creation date
4/24/2017 10:05:27 AM
Metadata
Fields
Template:
BOCC
Date
8/1/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830801
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 , <br /> 131 <br /> _ <br /> 1 <br /> 1(5) Development of design criteria for future expansion of the Town <br /> Hillsborough's sewage collection system. <br /> (6) Development of preliminary cost estimates for improvements to th <br /> existing sewage collection system and new sewers recommended in <br /> report, as well as long term maintenance and operating expenses. <br /> (7) Development of a suggested "priority of construction" list for <br /> recommended improvements to the existing collection system and <br /> future expansions of the system. <br /> 0) Recommendations for methods of financing the construction of the <br /> proposed improvements, including tap-on charges, special assessme <br /> and special service tax districts and what would be the projected <br /> ' per month sewer rates (cost per 1 ,000 gallons) for the customer. <br /> WATER <br /> (1) A study of the present and projected population and land uses of <br /> ! study area to determine initial and future water requirements for <br /> 1 <br /> residential , commercial and industrial use, and for fire protectic <br /> purposes. <br /> (d) Preparation of preliminary layouts of major transmission lines to <br /> serve the study area. <br /> (3) Analysis of the effect that new transmission lines and water deman <br /> requirements will have on the existing Town of Hillsborough and <br /> Orange-Alamance Water Authority water systems, including the water <br /> 1 treatment plants of each. <br /> (4) Preparation of preliminary layouts of improvements that will be <br /> required in the existing Water distribution systems of Hillsborouni <br />
The URL can be used to link to this page
Your browser does not support the video tag.