Browse
Search
Agenda - 08-01-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 08-01-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 3:21:25 PM
Creation date
4/24/2017 10:05:27 AM
Metadata
Fields
Template:
BOCC
Date
8/1/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830801
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: • '' • <br /> 13( <br /> _ <br /> 1 <br /> NORTH CAROLINA <br /> ORANGE COUNTY <br /> 1 <br /> THIS AGREEMENT is made and entered into by and between the County o <br /> Orange, North Carolina, hereinafter referred to as the "County", and the John <br /> R. McAdailis Company, Inc. , hereinafter referred to as the "Consultant". <br /> I WITNESSETH: <br /> I. The Consultant, for and in consideration of the covenants hereinafter set <br /> forth and the compensation to be paid to the Consultant as hereinafter <br /> spealfied, agrees to conduct engineering studies and prepare reports for i <br /> Orange County Board of Commissioners on Cheeks Township Water and Sewer <br /> Extension Feasibility, and Upper Eno Reservoir Development Feasibility. T <br /> conduct these studies and prepare these reports the Consultant shall inclu <br /> but n4 necessarily be limited to, the following elements: <br /> 1 <br /> A. Cheeks Township Water and Sewer Extension Feasibility <br /> SEWER <br /> 1 <br /> (1) A study of the present and projected population and residential ,- <br /> commercial and industrial land uses of the study area to determine <br /> initial and future sewage flows. <br /> (2) Preparation of preliminary layouts of collector sewers , pump stat <br /> I and force mains to serve the study area. <br /> 1 <br /> (3) Complete analysis of the effect that the new sewers and sewage fir <br /> will have on the Town of Hillsborough's existing collection system <br /> and wastewater treatment facilities. <br /> (4) Preparation of preliminary layouts of improvements that will be <br /> rorminnA in .64 <br />
The URL can be used to link to this page
Your browser does not support the video tag.