Browse
Search
Agenda - 07-05-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 07-05-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:20:16 PM
Creation date
4/24/2017 10:00:53 AM
Metadata
Fields
Template:
BOCC
Date
7/5/1983
Meeting Type
Regular Meeting
Document Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
167
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
... <br /> • <br /> 'Note Coast action of a Private loaf must confrom with the requirements of the <br /> :Orange County Se 4imentatiou andrrErosion Control.Ordinance. This ordinance require: <br /> that precautions be taken to pervent damage by soil erosion or seAimg.ntation regarc <br /> less of the amount of land disturbance. When the amount of land disturbance exceec <br /> 20,000 square feet, the property owner or his agent is required to obtain the <br /> necessary permits;and to pay the appropiate fees. Generally, permits and fees are <br /> required when tha length of the Private Road exceeds 1,000 feet for a Class C road, <br /> 770 feet for a Class B road or 520 for C'IaSS A road. The permit must be <br /> obtained,before construction begins. Contact the Erosion Control Officer for <br /> assistance. - - <br /> i <br /> -GENERAL SUBDIVISION APPROVAL S3•UENCE <br /> - <br /> Submit request for sx,b0+vision and Private Road to Orange County Planning <br /> Department. Check proposed road name with Planning Department list to avoid <br /> duplication. <br /> Apply fbr grading permit if land disturbance invloves more than 20,000 <br /> square feet. <br /> Receive subdivision approval. <br /> Construct road to Orange County standards or post security bond for <br /> construction of the road. <br /> Record final subdivision plat with Register of Deeds. <br /> I GENERAL CONSTRUCTION SEQUENCE <br /> Contact Planning Department before beginning construction so inspections <br /> can be scheduled. 'Remove all trees, stumps, roots and other vegetation from the <br /> width of right-of-way necessary to construct the road to the required dimensions. <br /> Pill and compact all depressions created by clearing. <br /> Build roadbed to required dimensions, cutting, filling and compacting where <br /> necessary for a desirable grade. <br /> Install culverts to provide cross drainage. <br /> Construct side ditches and crown travelway. <br /> Place and compact 4" of surface material. <br />
The URL can be used to link to this page
Your browser does not support the video tag.