Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Clyde Graves <br />Address: 8109 Atkins Rd. <br />City: Mebane, N,C, 27302 <br />Phone Number: 562-540:3 <br />Date: July 8, 2005 <br />Plumbing: <br />8. Install a new shower surround , Prepare the existing wall-boazd <br />to receive the new wall surround, Glue the surround to the wall. <br />Caulk al] necessary edges where the surround meets the tub. <br />9. Install a sanitary well-head seal for the well, Pour a concrete <br />pad 42" x 72" in the well house. Make all plumbing and well <br />pump connections. <br />10. Pump, crush and fill the existing septic tank, Install a new <br />septic tank per Environmental Health Codes. Make all inlet & <br />outlet connections, All work shall pass the Environmental Health <br />Standards. <br />Page 5 <br />Living Room, Foyer & Stairwell: <br />1. Prepare the walls, ceiling, trim & doors for paint. Fill all nail holes <br />with painters putty. <br />Paint the walls and ceiling with flat latex paint, Paint the doors and <br />trim with semi-gloss latex paint, All paint shall cover <br />completely, <br />2, Prepare the mantle for paint. Paint the mantle with semi-gloss latex <br />paint. The paint shall cover completely, Lead based paint is present <br />on the mantle, Use Lead Based paint Safe Work Practices, <br />3. Prepaze the floor for vinyh Remove all loose or damaged vinyl. <br />Install '/n inch plywood and a new vinyl floor. The vinyl to <br />cost not less than $14 sgyd. Install metal trim as necessary, <br />Install painted shoe molding at all wall and cabinet areas. <br />Dining Room: <br />1, Prepaze the walls, ceiling and trim for paint, Paint the walls and <br />and ceiling with flat latex paint, Paint all trim with semi-gloss <br />latex paint, All paint shall cover completely, <br />
The URL can be used to link to this page
Your browser does not support the video tag.