Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Clyde Graves <br />Address: 8109 Atkins Rd, <br />City: Mebane, N.C. 27302 <br />Phone Number: 562-5403 <br />Date:.Iuly 8, 2005 <br />Electrical: <br />7. Install azc fault interrupter circuits on the bedroom circuits, <br />9. Instal] electrical box extension rings on all electric boxes in the 1st <br />floor bedrooms. The extensions are to allow for the new sheetrock, <br />10. <br />Install a 2"`~ ceiling light fixture controlled by a wall switch for the <br />commode area. Position the light fixture to give adequate light to the <br />commode. Make all electrical connections, <br />Page 4 <br />Install a permanent receptacle box and circuit for the well pump. <br />Install a service light for the well house. All plumbing and electrical <br />shall meet the NC Electrical and Plumbing Codes. _ <br />Plumbing: <br />1. Install new supply lines from the well pump to all fixtures in the <br />kitchen and bath, Remove all existing supply lines. <br />2. Install a new drain line assembly for the kitchen sink. The drain- <br />line shall include all fittings and mechanical vent. <br />3, Install a new double bowl stainless steel sink in the kitchen. Install <br />aluminum strainer, supply lines and new cutoffs, <br />4, Install a single lever, washer-less faucet with sprayer on the <br />kitchen sink, <br />5. Install a main water cutoff within 5 feet from the crawlspace <br />access door. <br />6. Install a hand held shower with two clips. Install one clip at normal <br />shower height. Install the 2nd clip 40 inches from the tub bottom, <br />7. Install a new tank lid for the commode, <br />
The URL can be used to link to this page
Your browser does not support the video tag.