Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Clyde Graves <br />Address: 8109 Atkins Rd. <br />City: Mebane, N,G 27302 <br />Phone Number-562-5403 <br />Date: July 8, 2005 <br />crawlspace: <br />1. Install four dropped girders below the back porch floor framing. <br />The girder size and footings, shall be approved by the Orange <br />County Inspection Department, Install adjustable posts jacks <br />placed Sft OC, <br />2. Remove all debris from the crawlspace, Install 6-mil poly in the <br />crawlspace, <br />Install two dropped girders below the bathroom floor, <br />Install two dropped girders below the kitchen floor, <br />The girder size and footing shall be approved by the Orange <br />County Inspection Department. Install adjustable posts jacks <br />placed Sft OC. <br />Roof: <br />Repair three leaks in the roof. <br />1. Leak on the front left corner <br />2, Leak located where the front porch ridge meets the main roof: <br />3, Leak located on the reaz section in the porch ceiling. <br />Check these areas far raised nails and or damaged metal, Caulk <br />all questionable areas, <br />2. Prepare the roof far paint. Clean all loose debris from the metal <br />roof. Apply two (2) coats of paint designed for metal roofing. <br />3, hlstail aluminum, continuous gutters and downspouts, Install <br />plastic splash-blocks under each downspout. Attach a 10 ft <br />section of soliddrain-tile to the front downspouts to divert <br />water away from the unit. <br />Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.