Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Name: Clyde Graves <br />Address: 8109 Atkins Rd, <br />City: Mebane, N.C. 27302 <br />Phone Number: 562-5403 <br />Date: July 8, 2005 <br />Exterior: <br />Install 12 automatic foundation vents around the perimeter <br />foundation walls. All vents shall be secure, <br />Page 1 <br />2, Prepaze the foundation block walls for abase/scratch coat. Apply one <br />base coat of cement based stucco, Apply one coat offiber-reinforced <br />cement to strengthen the foundation walls. Color white, _ <br />3. Install a new treated crawlspace door and frame, hrstall a 2x4 <br />treated frame and 3/4 inch treated plywood door, Install new <br />galvanized hinges and locking hasp. <br />4, Install D-5 vinyl siding over all existing wood siding, Install ''/a" <br />fan fold insulation before the siding is installed. Cover the gable <br />vents with vented soffit. Install all necessay vinyl trim and <br />corners, <br />5, Prepare the fascias, eves and overhangs for aluminum coil trim, <br />Install all necessary gutter boards and wood framing to properly <br />install the white aluminum coil stock. <br />Wrap all door & window frames with white coil stock. Wrap all <br />exterior boxing with white coil stock, Install vented soffit on the front, <br />rear and porch overhangs. Install solid soffit on the three gables. <br />Install solid soffit on both front and back porch ceilings. _ <br />6. Install two, 32 inch six panel metal exterior door units on the back <br />porch. The new door units shall have an aluminum threshold and <br />weather-stripping, Install a keyed lockset & deadbolt keyed <br />the same. Install a wide view door viewer in bath new door units, <br />Install all necessary framing and trim on the interior to finish the <br />unit's interior. Prime and paint the casing with asemi-gloss latex <br />paint. <br />A Lead Paint Abatement Contractor will remove the existing <br />doors, <br />Remove the existing handrails on the ramp, Install new pressure <br />treated handrails. The handrails shall be 36" tall and placed on both <br />sides of the ramp. The railings shall be secure and meet the NC <br />Building Codes for Ramp Handrails. <br />
The URL can be used to link to this page
Your browser does not support the video tag.