Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 <br />Name: Clyde Graves <br />Address: 8109 Atkins Rd, <br />City: Mebane, N,C. 27.302 <br />Phone Number: 562-5403 <br />Date: February 1, 2005 <br />Exterior: <br />3. Remove the wood between all rafters to allow ventilafion into the <br />attic. Package in 6-mil polyethylene and properly dispose of. <br />4, Remove the windowsills on the right/reaz side of the unit. The <br />sills shall be flush with the existing siding, <br />5. Remove the two doors on the reaz porch, Cut a 34 1/2 x 82 %z inch <br />opening in the siding to receive a 32 inch door unit. <br />(Note) The rehab. contractor shall frame the opening to receive <br />new door unit. <br />6. Remove the four (4) windows on the 2"~ floor. <br />7. Prepare the siding, soffits and rakes for vinyl and coil stock. <br />Remove loose chips of 1"minimum dimension and stabilize <br />deteriorated paint that does not break off in place to a moderate <br />touch, Apply a Tyvek, or similar vapor bamer to enclose the lead <br />containing paint on the siding, Prevent paint chip material from <br />falling out of the barrier by lapping the successive lower layers a <br />minimum .3" and over the top ofthe upper barrier. Lap and turn all <br />corners and ends a minimum of 12", Apply a Lead Block primer <br />to the soffits and overhangs to stabilise the existing paint, <br />Note: All lead paint debris including paint chips and wood shall be double <br />bagged and goose neck tied in 6-mil poly, All debris shall be properly <br />labeled and disposed of at a Licensed Landfill, <br />A copy of the Lead Abatement Contractor's License shall be submitted <br />to the Orange County Housing/Community Development Office, <br />All permits and applications shall be acquired before work is to begin. <br />( Lead Abatement Permit) <br />All work shall comply with the N,C. Deparhnent of Health and Human <br />Services- Lead-Based Paint Hazazd Management Program <br />Page 2 <br />Total Labor & Material <br />
The URL can be used to link to this page
Your browser does not support the video tag.