Browse
Search
Agenda - 02-21-2006-5j
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 02-21-2006
>
Agenda - 02-21-2006-5j
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 8:51:23 AM
Creation date
8/29/2008 9:07:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2006
Document Type
Agenda
Agenda Item
5j
Document Relationships
2006 NS Housing - Housing Rehabilitation Contract Awards
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2006
Minutes - 20060221
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 <br />Name: Clyde Graves <br />Address: 8109 Atkins Rd. <br />City: Mebane, N.C. 27302 <br />Phone Number: 562-5403 <br />Date: July 8, 2005 <br />Bedroom # 2: <br />2, Trim the bedroom and closet doors to open and close properly. <br />Prime the doors, jamb and casing with an oil based primer. <br />Paint the doors,,jamb and casing with semi-gloss latex paint. <br />The paint shall cover completely. <br />3, Install new 3 '/4 inch baseboard, Prime the baseboard with an oil <br />based primer. <br />4. Prepaze the walls, ceiling, trim and doors for paint. Paint the walls <br />and ceiling with flat latex paint. Paint the trim and doors with semi- <br />gloss latex paint, All paint shall cover completely, <br />Back Porch: <br />Remove the damaged band on the rear section of the back parch. <br />Replace approximately 161inear ft. Remove any siding necessary to <br />expose the damaged band, Install matching lumber, _ <br />2. Remove 64 sq ft of damaged sub-floor, Install matching <br />sheathing, <br />Prepaze the floor for vinyl, Install %a inch lauan plywood and a new <br />vinyl floor. The vinyl to cost not less than $ 14 sq. yd. <br />Install shoe molding at all wall areas, Prime and paint the shoe <br />molding with semi-gloss latex paint, <br />2"n Floor: <br />Trim the 2"d floor doors to open and close properly. <br />2, Install jamb-up type weather-stripping on the 2"d floor doors. <br />3. Install door sweeps on all 2"d floor doors, <br />Page 8 <br />4, Patch the flu opening in the 2"~ floor bedroom. All material used <br />must be fire proof <br />
The URL can be used to link to this page
Your browser does not support the video tag.