Browse
Search
2017-141-E AMS - C. T. Wilson Construction Company to renovate existing conference rooms 009 & 011 at WCOB for 911 backup call center
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2017
>
2017-141-E AMS - C. T. Wilson Construction Company to renovate existing conference rooms 009 & 011 at WCOB for 911 backup call center
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2018 12:16:10 PM
Creation date
4/20/2017 11:28:25 AM
Metadata
Fields
Template:
Contract
Date
4/11/2017
Contract Starting Date
4/11/2017
Contract Ending Date
5/15/2017
Contract Document Type
Agreement - Construction
Amount
$105,548.00
Document Relationships
R 2017-141-E AMS - C. T. Wilson Construction Company to renovate existing conference rooms 009 & 011 at WCOB for 911 backup call center
(Linked To)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: DECF6679-6CE4-4F10-926B-935C4585D3D8 <br /> [Departmental Use Only] <br /> TITLE 911 Back Up Call Center <br /> FY 2016-17 <br /> NORTH CAROLINA <br /> CONSTRUCTION AGREEMENT UNDER$250,000.00 <br /> ORANGE COUNTY <br /> THIS CONSTRUCTION AGREEMENT (hereinafter called "Agreement"), made as of the 11th <br /> day of April, 2017, by and between C.T. Wilson Construction Company, (hereinafter called the <br /> "Contractor"), and Orange County, a body politic and a political subdivision of the State of North <br /> Carolina, (hereinafter called the "Owner"). <br /> WITNESSETH: <br /> That the Contractor and the Owner, for the consideration herein named, agree as follows: <br /> 1. CONTRACT DOCUMENTS; PRIORITY <br /> The Contract Documents consist of this Agreement, the Request for Proposals, Proposal, <br /> Construction Drawings, and Written Specifications. The Contract Documents form the Contract. In the <br /> event of any inconsistency between or among the Contract Documents the Contract Documents shall be <br /> interpreted in the following order of priority: <br /> a. This Agreement. <br /> b. Designer Approved Bulletins and/or Field Orders. <br /> c. Request for Proposals and addenda thereto. <br /> d. Proposal. <br /> 2. SCOPE OF WORK <br /> The Contractor shall furnish and deliver all of the materials, and perform all of the work <br /> required by this Agreement within the time period stipulated in a written Notice-to-Proceed to be <br /> executed by the Contractor and Owner and in accordance with the following enumerated documents, <br /> which are made a part hereof as if fully contained herein: <br /> a. Construction Drawings prepared by RN&M Engineers (Sheet A1.1, ME0.1, ME1.0, <br /> ME2.0 dated 3/14/17) <br /> b. Written specifications prepared by the project engineer. <br /> c. C.T. Wilson Construction Company proposal dated April 10, 2017 which fully describes <br /> the work to be performed. Such work will hereafter be called the "Work". <br /> d. Related documents listed under Section 1 above. <br /> Revised 2/17 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.