Browse
Search
Agenda - 06-21-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 06-21-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 8:08:12 AM
Creation date
4/18/2017 2:47:10 PM
Metadata
Fields
Template:
BOCC
Date
6/21/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830621
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Secondly, the question exists of how much to devote to capital needs within the upcoming budget. <br /> Progress has been made by the school boards and County in coming up with elements of an eventual capital plan. <br /> Specifically, I'll) expenditure information from the last 10 years was compiled; (2) new needs were costed out <br /> and shown annually for the next 5 years; (3) there was agreement on definition so that each entity classifies <br /> projects in the same manner;(4) new major construction was separated from maintenance. It is clear from the <br /> latter that new long-term revenue sources will be necessary to make any appreciable progress on new construc- <br /> tion. Annual property tax revenue, on the other hand, should continue to be used to repair and maintain <br /> buildings already in existence so that the investment of previous tax and bond proceeds is safeguarded. <br /> Staff analyzed each request, discussed details with school personnel and in some cases made on-sight <br /> visits. From these the recommended capital budget for 1983-84 is as follows; <br /> Orange County Schools $517,980 <br /> Chapel Rill-Carrboro Schools 350,000 <br /> Orange County 406,420 <br /> The Orange County amount is higher in order to remove asbestos (5 of the seven buildings have this material as <br /> ceilings and pipe covering) , re-roof an addition at the High School and Charles W. Stanford buildings 1 and 3, <br /> perform minor capital and equipment replacement as might be prioritized by the School Board within available <br /> funds. <br /> Chapel Hill-Carrboro's allocation would be sufficient to cover all of Category I projects or a combi- <br /> nation of Category I, II and III projects as might be pri <br />
The URL can be used to link to this page
Your browser does not support the video tag.