Orange County NC Website
Secondly, the question exists of how much to devote to capital needs within the upcoming budget. <br /> Progress has been made by the school boards and County in coming up with elements of an eventual capital plan. <br /> Specifically, I'll) expenditure information from the last 10 years was compiled; (2) new needs were costed out <br /> and shown annually for the next 5 years; (3) there was agreement on definition so that each entity classifies <br /> projects in the same manner;(4) new major construction was separated from maintenance. It is clear from the <br /> latter that new long-term revenue sources will be necessary to make any appreciable progress on new construc- <br /> tion. Annual property tax revenue, on the other hand, should continue to be used to repair and maintain <br /> buildings already in existence so that the investment of previous tax and bond proceeds is safeguarded. <br /> Staff analyzed each request, discussed details with school personnel and in some cases made on-sight <br /> visits. From these the recommended capital budget for 1983-84 is as follows; <br /> Orange County Schools $517,980 <br /> Chapel Rill-Carrboro Schools 350,000 <br /> Orange County 406,420 <br /> The Orange County amount is higher in order to remove asbestos (5 of the seven buildings have this material as <br /> ceilings and pipe covering) , re-roof an addition at the High School and Charles W. Stanford buildings 1 and 3, <br /> perform minor capital and equipment replacement as might be prioritized by the School Board within available <br /> funds. <br /> Chapel Hill-Carrboro's allocation would be sufficient to cover all of Category I projects or a combi- <br /> nation of Category I, II and III projects as might be pri <br />