Orange County NC Website
-3- <br /> Sunlitary Consideration <br /> 1. A joint project would entail the County assuming responsibility for <br /> sewage collection and treatment. <br /> 2. Installation cost would be split on the basis of volume with one-third <br /> of the non-grant share ($18,000) to be paid by the School System and <br /> two-thirds ($36,215) by the County front ended for the Subdivision for <br /> the correction of a public health problem.. Actual County cash outlay <br /> would be $23,715 assuming there could be an $8,000 credit for donated <br /> land and $4,500 from the trade-in ofothe existing package treatment <br /> plant. <br /> Monthly operating/maintenance/and debt service cost is higher than <br /> desired principally because of the cost of the loan pay back to the <br /> Farmer's Home Administration. <br /> 4. Thought should be given as to what policy precedent might be established <br /> by the County subsidizing the installation cost ($23,715) attributable <br /> to the subdivision. There are other areas experiencing similar problems . <br /> Kenneth R. Thompson <br /> KRT:nm <br />