Orange County NC Website
lit..;?;,;,,,iti7!7■75,":•1::Ip::7,,.*:,r-d174:15■Si .:.: ■va....0.,.. <br /> . .. <br /> "- ' ' • ' . <br /> 052 <br /> . . <br /> , _ __. ............... _:. <br /> ......... . _ .... <br /> . !.■r': <br /> I '.1..i. <br /> STANDARDS FOR PRIVATE WADS <br /> , . <br /> - <br /> . • <br /> Travelway . <br /> The traveiway must be surfaced and compacted with a material acceptable <br /> to Orange County to the required width of the particular class of road. A <br /> crown should be built into the traveiway so that water will drain from the road <br /> surface into the side ditch. 'The crown should not be so great as to cause vehicles <br /> to slide off the travel-way when ice or show are on the road. • 1 ;"'- <br /> ;: i I•,,-,: <br /> Generally the road should be crowned as shown in the specifications sheet <br /> so that runoff will drain to the ditches on both sides of the road. However,..in. <br /> some situations it may be desirable not to crown the road but to have the <br /> travelway sloped to a single ditCh as shown below. This is applicable in two <br /> situations: where it is necessary to cut down on the length of a ditch in order tf. <br /> 1 , <br /> to reduce the erosion potential by decreasing the volume of runoff r or where <br /> it it difficult to construct ditches due to rock or in, curves. <br /> i . <br /> , . <br /> ....**.....'s.ss `'..........,............ , .:....., <br /> PITCH OF TRA VELWAY i 1,,......: <br /> ; 1 <br /> .1::... <br /> Surface Materials <br /> Acceptable material for surfacing the traveiway is Aggregate Base Course <br /> (commonly called "crusher run"). Soil type base materials (commonly called <br /> "Chapel Bill Gravel" or"Chapel Bill Grit") will be accepted under the following <br /> , <br /> conditions <br /> i L-- <br /> .;;I. <br /> The material originates from a quarry approved by the North CArolina . , . <br /> , . <br /> Department of Transportation. <br /> The grade of the road is less than 8%. <br /> Where the grade is greater than 8% a layer of crusher run stone will <br /> ! be placed over the Chapel Hill Gravel before compaction. <br /> Sources of surface material shall be verified with the Orange County 1*-- <br /> '. Planning Department before use. <br /> . . <br /> . — <br /> Fill Material <br /> Where filling is necessary to raise the roadbed, cross watercourses or <br /> fill stumpholes, it shall be done with suitable material that is free of roots <br /> , .. or other organic matter. The fill should be firmly compacted to reduce settle-. <br /> ment that will cause ruts or holes in the finished road. <br /> . i . <br /> , 1 <br /> 1 <br /> . i <br /> f 't• <br /> _ <br /> . . , <br /> . I <br /> ....„ . , " <br /> . ;t• , <br /> - - 7 1,4 .,•'. <br />