Orange County NC Website
094 <br /> Memo <br /> May 17, 1983 <br /> Page 3 <br /> lot sizes of two and even five acres. The Wake County Manager has recently <br /> approved a Consignment for staff to develop stormwater management standards. <br /> Gurley noted the greatest development pressures have been rezoningsand re- <br /> quests for ETA expansion. <br /> Holland concluded the presentation by stating the challenge as coming to <br /> terms with a, development consensus and, then, when the location for develop- <br /> ment is detelrmined, overlay desired protection measures. Blaha clarified that <br /> in an undevloped watershed with minimal point sources of pollution, stormwater <br /> is a Significant contributor of pollution. He added that the process was one <br /> of tradeoffs; between development needs and water quality protection concerns. <br /> /dg <br />