Browse
Search
Agenda - 04-19-1983
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1980's
>
1983
>
Agenda - 04-19-1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2017 4:45:20 PM
Creation date
4/18/2017 2:13:43 PM
Metadata
Fields
Template:
BOCC
Date
4/19/1983
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
Minutes - 19830419
(Linked From)
Path:
\Board of County Commissioners\Minutes - Approved\1980's\1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
: <br /> ;',' • ' ;* • - <br /> .,;; 4;. / ifj-S,2■4411.,FA: • 7, '••• ;• • ' - <br /> •I•' ••-> • ...c: • - <br /> 4.; 377i 5', <br /> - -_' , • ;,!rh <br /> •' <br /> :< • ', " - • <br /> 7• • - • - <br /> ■ <br /> I <br /> Request for Proposalsi <br /> March 21, 1983 <br /> Page Four <br /> (7)" Developmetilt of a suggested "priority of construction" list <br /> for recommended improvements to the existing collection <br /> system and future expansions : f thesyStem. <br /> (8) Recommendations for methods of financing the construction <br /> of the proposed improvements including tap-on charges, <br /> special assessments and special service tax districts and <br /> what would be the projected per month sewer rates (cost <br /> per 1,0001gallons) for the customer. <br /> WATER <br /> (1) A study of the present and projected propulation and land <br /> uses of tie study area to determine initial and future <br /> water requirements for residential, commercial and indus- <br /> trial use, and for fire protection purposes. <br /> (2) Preparatiop. of preliminary layouts of major transmission <br /> lines to serve the study area. <br /> (3) Analysis of the effect that new transmission lines and <br /> water demand requirements will have on the existing <br /> Town of Hillsborough and Orange-Alamance Water Authority <br /> water systSms, including the water treatment plants of <br /> each. <br /> • <br /> (4) Preparation of preliminary layouts of improvements that <br /> will be required in the existing water distribution <br /> systems of1Hillsborough and the Orange-ALamance Water <br /> Authority in order for the distribution lines to provide <br /> adequate service for consumption and fire protection. <br /> (5) Development of design criteria for future expansion of <br /> Hillsborough's water distribution system as well as that <br /> of the Orarige-Alamance Water Authority. <br /> (6) Development of preliminary cost estimates for improvements <br /> to these existing water distribution systems and new services <br /> provided iti. the report, ass well as long-term maintenance <br /> and operating expenses. <br /> (7) Development of a suggested "priority of construction" list <br /> for recommended improvements to the existing water distri- <br /> bution system and future expansion of the system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.